L'invitation prend fin at - Buyandsell.gc.ca

30 juin 2016 - File No. - N° de dossier. QCM-6-39039 (009) ... AMENDMENT #6. This amendment contains: 1. ... $______. $______. 01 29 00 b) MG-56. m.t..
65KB taille 2 téléchargements 41 vues
Part - Partie 1 of - de 2 See Part 2 for Clauses and Conditions Voir Partie 2 pour Clauses et Conditions

1

1

RETURN BIDS TO: RETOURNER LES SOUMISSIONS À:

Title - Sujet

Réception des soumissions - TPSGC / Bid Receiving - PWGSC 1550, Avenue d'Estimauville 1550, D'Estimauville Avenue Québec Québec G1J 0C7

Solicitation No. - N° de l'invitation

Amendment No. - N° modif.

EE519-170240/A

006

Client Reference No. - N° de référence du client

Date

EE519-170240

2016-06-30

Réfection quai - Ste-Anne-des-Monts

GETS Reference No. - N° de référence de SEAG

PW-$QCM-004-16769 File No. - N° de dossier

CCC No./N° CCC - FMS No./N° VME

QCM-6-39039 (009)

SOLICITATION AMENDMENT MODIFICATION DE L'INVITATION The referenced document is hereby revised; unless otherwise indicated, all other terms and conditions of the Solicitation remain the same.

Solicitation Closes - L'invitation prend fin at - à 02:00 PM on - le 2016-07-04

Eastern Daylight Saving Time EDT

F.O.B. - F.A.B. Plant-Usine:

Destination:

Other-Autre:

Address Enquiries to: - Adresser toutes questions à:

Buyer Id - Id de l'acheteur

qcm009

Thellend, François Ce document est par la présente révisé; sauf indication contraire, les modalités de l'invitation demeurent les mêmes.

Time Zone Fuseau horaire

Telephone No. - N° de téléphone

FAX No. - N° de FAX

(418) 649-2889 (

(418) 648-2209

)

Destination - of Goods, Services, and Construction: Destination - des biens, services et construction:

Comments - Commentaires

Vendor/Firm Name and Address Raison sociale et adresse du fournisseur/de l'entrepreneur

Instructions: See Herein Instructions: Voir aux présentes

Delivery Required - Livraison exigée

Delivery Offered - Livraison proposée

Vendor/Firm Name and Address Raison sociale et adresse du fournisseur/de l'entrepreneur

Issuing Office - Bureau de distribution

TPSGC-PWGSC 601-1550, Avenue d'Estimauville Québec Québec G1J 0C7

Telephone No. - N° de téléphone Facsimile No. - N° de télécopieur Name and title of person authorized to sign on behalf of Vendor/Firm (type or print) Nom et titre de la personne autorisée à signer au nom du fournisseur/ de l'entrepreneur (taper ou écrire en caractères d'imprimerie)

Signature

Page 1 of - de 1

Date

Solicitation No. - N° de l'invitation

Amd. No. - N° de la modif.

Buyer ID - Id de l'acheteur

EE519-170240/A

006

qcm009

Client Ref. No. - N° de réf. du client

File No. - N° du dossier

CCC No./N° CCC - FMS No./N° VME

EE519-170240

QCM-6-39039

AMENDMENT #6 This amendment contains: 1. Question & Answer (#11) QUESTION 11 : Are there any weight limits for the excavation and backfilling equipment? Only the mass of the carrier vehicle of the hydraulic hammer for demolition is specified (10,000 kg). ANSWER 11 : Equipment specified in section 01 24 16.05, paragraph 3.3.3.2 is related only to the demolition of concrete slab located under the asphalt layer. Weight limitation of equipment at 10,000 Kg and pneumatic hammer at 1,000 J is required to avoid any excessive vibration who could damage the remaining structure. This procedure is taken from the Cahier des Charges et Devis Généraux (CCDG). The 10,000 Kg limitation for carrying vehicle does not apply to work related to asphalt and aggregate excavation. To perform this work, Contractor is allowed to use conventional equipment (excavator, pulvo, trucks, etc.)

2. Price Table Replace the Combined Price Form by the one included in this solicitation amendment.

3. Technical Addendum #1 Technical addendum 1 replace sections 01 29 00 and 01 35 43 from the specifications and add annexes pertaining to the environmental characterization.

*** ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED ***

Page 1 sur 1

APPENDIX1ͲCombinedPriceForm

PROJECT R.075515.001 - Wharf refection, Sainte-Anne-des-Monts APPENDIX 1 - COMBINED PRICE FORM 1)

The prices per unit shall govern in establishing the Total Extended Amount. Any arithmetical errors in this Appendix will be corrected by Canada.

2)

Canada may reject the bid if any of the prices submitted do not reasonably reflect the cost of performing the part of the work to which that price applies.

LUMP SUM: The Lumps Sum Amount designates Work to which a Lump Sum Arrangement applies. (a) Work included in the Lump Sum Amount represents all work not included in the unit price table. Firm Price Applicable taxes extra

Item

Spec. Reference

1.1.1.3.1.1

01 29 00

Site layout

$____________

1.1.1.3.1.2

01 29 00

Scours clogging

$____________

01 29 00

a) Caissons B-5 and B-3

$____________

Class of labour, tools or materials

01 29 00

b) Caissons C-5 and C-7

$____________

1.1.1.3.1.3

01 29 00

"L" face repairs

$____________

1.1.1.3.1.4

01 29 00

Excavation of bituminous coating

$____________

1.1.1.3.1.5

01 29 00

Demolition of concrete slab

$____________

1.1.1.3.1.6

01 29 00

Excavation of aggregates B-C

$____________

1.1.1.3.1.7

01 29 00

Excavation of aggregates A-B

$____________

1.1.1.3.1.8

01 29 00

Electricity

$____________

1.1.1.3.1.9

01 29 00

Catch basin

$____________

1.1.1.3.1.10

01 29 00

Cleaning

$____________ LUMP SUM AMOUNT (LSA) Excluding applicable taxes:

$____________

APPENDIX1ͲCombinedPriceForm

UNIT PRICE TABLE The Unit Price Table designates Work to which a Unit Price Arrangement applies. a) Work included in each item is as described in the reference specification section. b) The Price per Unit shall not include any amounts for Work that is not included in that unit price item. Price per Unit (PU) Extended Amount Unit of Estimated applicable taxes (EQ x PU) applicable Measurem Quantity (EQ) extra taxes extra ent

Item

Specification reference

1,1,1,3,2,1

01 29 00

Concrete wall repairs



240

$____________

$____________

1,1,1,3,2,2

01 29 00

Geotextile



7000

$____________

$____________

1,1,1,3,2,3

01 29 00

Granular materials

01 29 00

a)

Stone 50-200 mm

m.t.

100

$____________

$____________

01 29 00

b)

MG-56

m.t.

5600

$____________

$____________

01 29 00

c)

MG-20

m.t.

2000

$____________

$____________

1,1,1,3,2,4

01 29 00

Roller compacted concrete (RCC)



6700

$____________

$____________

1,1,1,3,2,5

01 29 00

Concrete slab



80

$____________

$____________

1.1.1.3.2.6

01 29 00

Supplemental divers inspections

h

20

$____________

$____________

Class of Labour, Plant or Material

TOTAL EXTENDED AMOUNT (TEA) Excluding applicable taxes

TOTAL BID AMOUNT (LSA + TEA) Excluding applicable taxes

$____________

#VALEUR!