GANIL progress report WP 5 EURISOL & SAFERIB

Conception studies. Identification and. Repartition of radioactive gases. Evolution Calculus. Converter and UCX Target. Configuration and optimization of the.
371KB taille 15 téléchargements 285 vues
GANIL progress report WP 5 EURISOL & SAFERIB Manssour FADIL , Bertrand RANNOU SAFERIB Joint Meeting Warsaw University 1234567895 857 Warsaw, Poland

Our engagements Scientific and technical studies (SAFERIB) 1

Expansion of contamination and migration of radioactive gases radioactivity of transport lines and post-accelerator radioactivity in experimental areas

1

Radioactive gases storage

Legal study (EURISOL) 1

Conformity to legislation

Expansion of contamination and migration of radioactive gases

Preliminary studies

Conception studies

CRYORTRAPS

Preliminary studies

Code validation

Literature

Vacuum physics

Experiment

Ambient and cryogenic temperatures

Improvement of the code (Accommodation phenomenon)

MOVAK3D

Other current works

ITER vacuum team (KARLSRUHE)

Conception studies

Evolution Calculus Converter and UCX Target

Identification and Repartition of radioactive gases

Configuration and optimization of the CRYOTRAPS

Our planning CRYOTRAPS Prototype

GANIL

CRYOGENIC SOURCE

IPN/ORSAY

Design : end of 2005

Construction : in progress

Design : in progress Construction : in progress

First experimental test

Spring 2007

Preliminary Safety Report

Summer 2007

 715 15979171 7 7 97 1791 4 7 41777   3 575 1   6357

1 4 5 159 3 57 577 77 91 1 46   3 5 5794 389 1 7 494 9 77 123 4567895 438 4 533 15 89 9318 87 3416 58 123 1 8

123 4567895 438 4 533 15  9  8  5 123 1  23 1  9 455637  883 9 6559  8 87 8

1223431546789 3 9 1

0.11 % 1.0 109 Bq

9.5 1011 Bq

Conformity to legislation

Comparison between several European countries in term of nuclear legislation for implantation of facilities like EURISOL

Before December 2006

January – April 2007

Preliminary study – Collection of information

More detailed study – Analysis

Deliverables CRYOTRAPS

Detail report

Spring 2007

Conception studies Simulation tools Experimental tests Difficulties

Gas storage

Technical report

End of 2006

Collaboration with Thalès company

Conformity to legislation

Report of comparison study and conclusions

End of 2006