WP 5: Safety & Radioprotection

Safety & Radioprotection

4 sub-tasks

schedule

4y (D) Conformity to legislation

3y (C) Decommissioning (B) Radioactivity control, safety & risks

2y

1. 2. 3. 4. 5. 6. 7. 8.

Participants: GANIL, France FZJ, Germany LMU, Germany CERN, EU CEA, France NIPNE, Romania FI, Lithuania Univ. Warsaw, Poland

role - sub-task D - sub-task C - sub-task B - sub-task A - coordination - contribution - contribution - contribution

External partners: ORNL, ANL, TRIUMF, JAERI, KAERI

(A) Radiation, activation, shielding & doses

8 Jul. 2005, Liverpool, UK ([email protected])

1y

Total budget request: ~700 kEuros for this task

Sub-task A: Radiation, activation, shielding & doses (coord. by CERN; 0-24 months)

Safety & Radioprotection

1st year plan: benchmark calculations Particle and energy

Materials

Codes

protons and neutrons; 150 MeV – 1500 MeV

C, Be, Si, Fe, Hg, Pb, Ta, W, Th, U (both thin and thick targets)

FLUKA and MCNPX

Action

Observable

Participant (code)

Specific task

1

Neutron and photon attenuation

FI (MCNPX) and NIPNE (FLUKA)

CERN and CEA helps in defining the benchmarks and data

2

Neutron and charged particle production

CEA (MCNPX) and WU (FLUKA)

CEA provides data for thin targets; WU provides data for thick targets.

3

Production of residues

CEA (MCNPX) and CERN (FLUKA)

CEA provides data for thin targets; CERN provides data for thick targets

Preliminary results 1 EURISOL DS week in Nov. 2005 Final report 1 due to Feb. 2006 In collaboration with the tasks: WP 4 and WP 11 8 Jul. 2005, Liverpool, UK ([email protected])

Fe(p,xn)X à Ep = 1600 MeV 10 12

Safety & Radioprotection

10 11

Im

d σ/dΩdE (mbarn/MeV/sr)

10

0 ° (×1 10 0 )

10

10 ° ( ×10 9) 9

10

8

10

7

10

6

10

5

10

4

10

3

10

2

2

r po

10

40 ° ( ×10 7)

25 ° ( ×10 8)

55 ° ( ×10 6)

100

° (× 4 10 )

eo nc ta

115

° (× 3 10 )

145

° (× 10)

fb

85 °

(×1 5 0 )

130

° (× 10 2 )

160

°

10

m ch en

1

! ks ar

10 10

-1

Données Cascade Bertini

-2

1

Cascade Cugnon 10

2

Energie (MeV)

Good knowledge of physics is indispensable! 8 Jul. 2005, Liverpool, UK ([email protected])

10

10

3

J.-C. David (CEA)

Safety & Radioprotection 10

10 11

Production Rate, Atoms/µC

Production Rate, Atoms/µC

10

Hg 10

10

192

Xe

196

198

200

202

204

Atomic Number

206

646

7

10

6

194

 6

8

10

L.Zanini et al., ND2004, Santa Fe, Sept. 26 – Oct. 1, 2004

MCNPX (Bertini) MCNPX (INCL) FLUKA Data

190

9

10

10

118

MCNPX (Bertini) MCNPX (INCL) FLUKA Data 120

122

124

126

128

130

132

Atomic Number

1234567 89  

S. Leray (CEA)

Choice of default model parameters is not acceptable! 8 Jul. 2005, Liverpool, UK ([email protected])

134

1013Bq/kg

after 1 year irradiation

Concentration of atoms

Activity (Curies)

Safety & Radioprotection

volatiles

Cooling time Charge Z L. Donadille (CEA)

The best models should be used! 8 Jul. 2005, Liverpool, UK ([email protected])

Safety & Radioprotection

Sub-task B: Radio-activity control, safety & risk (coord. by LMU; 0-48 months)

1st year plan: • (B1) design of gas purification system & cryogenic trap prototype commissioning • (B2) model creation and validation for activity in the ground water • (B3) creation of the software platform for exposure evaluations

8 Jul. 2005, Liverpool, UK ([email protected])

1st year plan:

Safety & Radioprotection

• (B1) design of gas purification system & cryogenic trap prototype commissioning • (B2) model creation and validation for activity in the ground water • (B3) creation of the software platform for exposure evaluations

• Installed and connected to the He-refrigerator • Thermal sensors to be installed • Measurements with known tracer elements P. Thirolf (LMU) 8 Jul. 2005, Liverpool, UK ([email protected])

1st year plan:

Safety & Radioprotection

• (B1) design of gas purification system & cryogenic trap prototype commissioning • (B2) model creation and validation for activity in the ground water • (B3) creation of the software platform for exposure evaluations

• Experience gained in the design of ESS is being collected • TRACE/PARTRACE and SPRING codes are chosen • Validation with data based on pesticide transport in progress • Validation with data based on nuclear power plants to be done • Similar task in SAFERIB of EURONS

A. Plukis (FI) & R. Moormann (FZJ) 8 Jul. 2005, Liverpool, UK ([email protected])

1st year plan:

Safety & Radioprotection

• (B1) design of gas purification system & cryogenic trap prototype commissioning • (B2) model creation and validation for activity in the ground water • (B3) creation of the software platform for exposure evaluations

• Experience gained in the design and control of NPP is being collected • Software platform for EURISOL DS 1 Point Source Exposure 1 Acute Exposure to Environmental Releases 1 Prolonged Exposure to Environmental Releases • Data library creation for EURISOL DS 1 Routine Exposure Data 1 Emergency Exposure Data

F. Negoita (NIPNE) 8 Jul. 2005, Liverpool, UK ([email protected])

Safety & Radioprotection

Summary

• Some work well in progress and 1st results to be reported in EURISOL DS week • Creation of the WWW for the task 1 well in progress • Close collaboration with SAFERIB of EURONS 1 activated • Contact and collaboration with external partners 1 activated • Meetings held: T5-01-CERN-280105 T5-02-CEA-100605

2

“Kick-off” “Monte-Carlo”

• Meetings planned: T5-03-CEA-oct.05 in collaboration with SAFERIB

• Difficulties to hire good candidates

“progress”

3

• Start of the DS for safety and radioprotection still under “stand-by” Need of data for materials, dimensions, beam properties, etc. 8 Jul. 2005, Liverpool, UK ([email protected])

Safety & Radioprotection

Cyclotron “Nantes” Input: p, d, α (70 MeV; 1 mA) + target (?) Request: dimensions of concrete walls for doses