Construction – Detachment – Lac la Biche. Solicitation No. - No. de l'invitation. 201605828. Date. March 10, 2016. Client Reference No. - No. De. Référence du ...
289KB taille 9 téléchargements 294 vues
 

RETURN BIDS TO: RETOURNER LES SOUMISSIONS A: Bid Receiving/Réception des sousmissions

Title-Sujet:

Procurement & Contracting Services Branch, Visitors Centre Royal Canadian Mounted Police 73 Leikin Drive, Ottawa, ON K1A 0R2 (613) 843-3798

Construction – Detachment – Lac la Biche Solicitation No. - No. de l’invitation 201605828

Date March 10, 2016 Amendment No. – No du modification 001

Facsimile Number for Amendments: 613-825-0082

Client Reference No. - No. De Référence du Client 201605828

AMENDMENT - INVITATION TO TENDER

GETS Reference No. - No. de Référence de SEAG 201605828

MODIFICATION - APPPEL D’OFFRES

Solicitation Closes –L’invitation prend fin

Tender to: Royal Canadian Mounted Police We hereby offer to sell to Her Majesty the Queen in right of Canada, in accordance with the terms and conditions set out herein, referred to herein or attached hereto, the goods, services and construction listed herein and on any attached sheets at the price(s) set out therefore.

at - à 14:00 hrs ET on - le March 22, 2016 F.O.B. - F.A.B. Destination Address Enquiries to: - Adresser toutes questions à: [email protected]

Soumission aux: Gendarmerie royale du Canada

Telephone No. - No de telephone

Fax No. - No de FAX:

Nous offrons par la présente de vendre à Sa Majesté l Reine du chef du Canada, aux conditions énoncées ou incluses par référence dans la présente et aux annexes ci-jointes, les biens, services et construction énumérés ici sur toute feuille ci-annexée, au(x) prix indiqué(s).

613-843-5313

613-825-0082

Destination of Goods, Services, and Construction: Destinations des biens, services et construction: See herein

Comments - Commentaries

Vendor/Firm Name and Address Raison sociale et adresse du fournisseur/de l’entrepreneur Facsimile No. - No de télécopieur: Telephone No. - no de telephone:

 

This document contains a Security Requirement Delivery Required - Livraison exigée: See Herein

Delivery Offered Livraison proposée

Name and title of person authorized to sign on behalf of Vendor/Firm Nom et titre de la personne autorisée à signer au nom du fournisseur/de l’entrepreneur

Amendment #001 Amendment #001 of Solicitation 201605828 has been issued to correct the Bid & Acceptance Form, supply the site visit sign-in sheet, and provide meeting minutes as follows

1. Please delete the Bid and Acceptance Form in its entirety; And replace with the attached Bid and Acceptance Form.

2. See attached site visit sign-in sheet.

3. Please find minutes of site visit scheduled attached.

ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.

BID AND ACCEPTANCE FORM (BA) BA01

IDENTIFICATION

Construction – Detachment – Lac la Biche BA02

BUSINESS NAME AND ADDRESS OF BIDDER

Name:

____________________________________________________________________________

Address: ____________________________________________________________________________ ____________________________________________________________________________ Telephone: ____________________ Fax:_______________________

PBN:

__________________

Email:

____________________________________________________________________________

BA03

THE OFFER

The Bidder offers to Her Majesty the Queen in right of Canada to perform and complete the Work for the above named project in accordance with the Bid Documents for the Bid Amount of Section

01 29 83

Title

Total

Base Price (Bid)

$

Laboratory services testing allowance

$

Subtotal (excluding GST/HST)

120,000.00

$

Optional items to be exercised at the discretion of RCMP but included in evaluation of bids

01 23 10 1.4.1.2

Asphalt paving work to existing public parking & drive

$

01 23 15 1.4.2

Asphalt paving work to existing staff parking lot

$

Total (excluding GST/HST) to evaluate

$

BA04 BID VALIDITY PERIOD The bid shall not be withdrawn for a period of ninety (90) days following the date of solicitation closing. BA05 ACCEPTANCE AND CONTRACT Upon acceptance of the Contractor’s offer by Canada, a binding Contract shall be formed between Canada and the Contractor. The documents forming the Contract shall be the contract documents identified in Contract Documents (CD). BA06 CONSTRUCTION TIME The Contractor shall perform and substantially complete the Work by March 31st, 2018. BA07

BID SECURITY

The Bidder is enclosing bid security with its bid in accordance with GI08 - Bid Security Requirements of R2710T - General Instructions to Bidders. BA08

SIGNATURE

_________________________________________________ Name and title of person authorized to sign on behalf of Bidder (Type or print)

_______________________________ Signature

______________________________ Date

Meeting Notes Contractor Site Walk-through Govt. of Canada, Existing Building Renovation & Addition / Lac La Biche, AB

Date/Time:

March 4, 2016 / 10.30 am

Place:

RCMP, Lac Labiche, AB

Next Meeting:

TBA

Attendees:

Chuck Koch, PM, RCMP Kevin Finucane, Asset Manager, RCMP Hemna Marwah, Architect, Stantec-Calgary Vipul Chauhan, Senior Construction Administrator, Stantec-Edmonton

Absentees:

None

Distribution:

To all Attendees

Safety Moment: None at that meeting Item

Description 1. It was clarified by Stantec Architect that the construction will be phased as indicated on dwg A002 of the Tender set. RCMP PM underlined that this was critical and shall be strictly enforced. Refer to Section 01 11 00 of the specification, subsection 1.4.3.1

2. RCMP PM also highlighted that the work shall be 100% complete prior to Owner acceptance for occupancy, not Substantial Performance. Once the building is complete, accepted and handed over, there will be no access for the contractor thereafter for that part of phased construction. 3. It was clarified that a new site access has been proposed and as such the site services will need to be kept in due consideration including a new water line connection. 4. The landscape / civil involves a new CB in the new north parking area. All of this will involve relevant civil tie-in to the exiting. 5. The contractors walked through the entire building along with the basement where the access to the crawl space was inspected including the cell-Area. 6. Any down time will have to be brought into Deptt. Representative’s notice at least 48 hours in advance. Refer section 01 14 00 of the specification issued for tender. 7. All questions during the tender period will be addressed to Dale Rudderham and shall be responded to through an addendum

cv c:\users\vchauhan\desktop\contractor walk through - lac labiche - minutes of the meeting - march 04, 2016.docx

March 4, 2016 Contractor Site Walk-through Page 2 of 2

Item

Description from the consultants at least 5 days before the tender closes.

8. It was decided between the client representative and consultant team that it will indicated in the addendum that no parking will be allowed on premises and the contractor will have to manage his own parking. The meeting adjourned at 11.45 am The foregoing is considered to be a true and accurate record of all items discussed. If any discrepancies or inconsistencies are noted, please contact the writer immediately. Stantec Architecture Ltd.

Vipul Chauhan, Architect, AAA, OAA, MRAIC Senior Contracts Administrator Phone: (780) 969-2046 Fax: 780-917-6888 [email protected] Attachment: 1. Sign-in sheet

cv c:\users\vchauhan\desktop\contractor walk through - lac labiche - minutes of the meeting - march 04, 2016.docx