Maintenance Procedure for the Inspection of Oil Filter and
Maintenance Procedure for the. Inspection of Oil Filter and Suction Screen. 1. Drain engine oil. 2. Remove and examine the oil suction screen for any metallic ...
Lycoming 652 Oliver Street Williamsport, PA 17701 U.S.A.
Maintenance Procedure for the Inspection of Oil Filter and Suction Screen
1. Drain engine oil. 2. Remove and examine the oil suction screen for any metallic particles (Reference Figures 1 and 2). Retain any material that may be found for identification and replace screen.
NOTE: Location of the oil suction screen varies by engine model (side or bottom of sump).
Suction screen
Figure 1
Figure 2 SSP500
3. Remove and cut open oil filter. For full flow spin-on oil filters use the Champion CT-470 tool shown in Figure 3 or an equivalent oil filter cutter. 4. Remove the paper element from the filter and carefully unfold while examining for material trapped in the filter (reference 4 and 5).
Champion CT-470
Figure 3
Figure 5
Figure 4
5. If examination of the screen or filter indicates any aluminum material, contact a Textron Lycoming technical representative at the factory at (570) 323-6181. Textron Lycoming can assist with the material identification.
INSPECTION. 1. Visually inspect the caliper for corrosion, leaking hydraulic fluid, cracks or visible damage. 2. Check back plate attachment bolts to insure that ...
2. Visually inspect the wheels for corrosion, cracks, or other visible damage. 3. Inspect the brake disc for evidence of cracks, corrosion, deep grooves, or.
Insure that the wheel tie bolts are secure and have not worked loose. 2. Visually .... If the tube does not have a white dot, align the red dot on th tire with the valve ...
When all the component parts, wire harnesses and con- nectors of each circuit except the ECU are found to be normal in troubleshooting, then it is determined ...
maintain or hold pressure, the system should be bleed in accordance with paragraph ... value, not so tight that it prevents freedom of travel of the master cylinder.
Vinayagamoorthy, M. "Maintenence Inspection and Rating." .... All instructions for maintenance work, stress analysis, posting, further inspection, and ...... Total shear capacity: Vu. = (472 kN). 4. Rating Calculations. â²= f f c c. 0 4. â²fc .....
Sep 27, 2001 - flare forming tool for the size of tubing and type of fitting. ... 45-degree automotive flare forming tools may result in .... The use of a mandrel will.
Sep 27, 2001 - performed by jacking the aircraft according to .... and races as matched sets. .... between sections of sheet metal should be wa- ... metal runners may be straightened if minor ..... see that pressure holds for the required time.
distributed, would prove socially indifferent to the original subgroup distribution. Une nouvelle ... For example, given a measure of income inequality, how much of this ..... Then $ = 8.94, $1 = 8, .... ity would use these two numbers as primitives.
Jan 3, 2010 - Manual. Truck mixers should be equipped with counters or similar means to enable ... by ASTM C 94/C 94M to be certified as an ACI Concrete.
Installing an oil filter on an engine not equipped with a filter can increase the oil change interval from 25 to ..... When determining the total length of a filter and.
Mar 8, 2000 - from distillation residues from refinery processing. ... Some general physical-chemical parameters of fuel oil #6 are summarised in Table 1.
The coupler used a design-rule-based transformation .... â18 dB, and coupling is â28 dB or bet- ter across the ... The following electron microscope photos show ...
Jun 6, 1997 - Another example occurs when an elderly person climbs stairs, using a ... lization of head motion is a fundamental feature of. 10comotion~~ ..... The methods we used required subjects to adopt a standardized .... with rapid arm movements
s , such as is used in Eq. 1. The ... inverse mapping of Eq. 4, based on the estimated ... hold accurate only within the volume occupied by the test object. For each ...
For container part OP-093/01 (Student 01). For container part OP-087 (MarS I). For container part OP-103 (Real-X). For container part OP-095 T (MarS-T).
surface to be estimated. LIF spectra .... reflectance above the water surface to the thickness of the oil layer. ... which is very convenient to visually highlight the useful information into a âALSâ colour enhanced ... Rayleigh and Raman scatter
and assessment units (AU). Field type. Largest expected mean field size. Total undiscovered resources. Oil (MMBO). Gas (BCFG). NGL (MMBNGL). F95. F50. F5.
Blue. Green/Yellow. Blue. Black. Brown. L1. L2. 115 Volt single Phase fans. 230 Volt single Phase fans. CA. E. D dimensions and Wiring (Models FKD 12XL, 14, ...
aplicable para protección del consumidor. Usted puede tener derechos adicionales que varÃan de estado en estado. Garantie de 5 ans. Garantia por cinco (5) ...