Apr 25, 2012 - The Talon FS and FX are very similar in construction and therefore in ... Step 4. Position the ring on the end of the lanyard BETWEEN the two ...
May 3, 2001 - manufacturing whether caused by negligence on the part of the .... relocation to preclude interruption while awaiting quality control approval of your new facility .... Proper container sizing is one of the more difficult processes in .
malfunctions that may be fatal. Kill-line pilot chutes MUST be cocked each time the parachute is packed. Remove the rapide link from bottom end of bridle.
hard openings by never exceeding the limits shown on the warning label. ... Some body positions (i.e. head down, stand up, and long dives) ...... Main lift web. 2.
Dec 1, 2015 - hard openings by never exceeding the limits shown on the warning label. ... Some body positions (i.e. head down, stand up, and long dives) may enable the ..... Bend forward at your waist and hoist your rig from the bottom so ...
Mar 24, 2014 - SERVICE BULLETIN: RI harness and container systems listed above may be assembled with the MarS M2, by a certificated and appropriately ...
Dec 1, 2015 - Some body positions (i.e. head down, stand up, and long dives) may enable the ... If the buyer declines to waive liability on the part of the manufacturer, buyer may obtain a full ..... Bend forward at your waist and hoist your rig.
Dec 1, 2015 - malfunctions that may be fatal. Kill-line pilot chutes MUST be cocked each time the parachute is packed. Remove the rapide link from bottom ...
pocket. 2. Vigil 2 AAD assembly with Spectra closing loop and washer- Vigil or Cypres configuration (Figure 1). Note: The instructions and following photos are.
Dec 1, 2015 - program of instructionâ in the use of this parachute ..... Route main risers over shoulders and close the main riser covers and route the main ...
Dec 23, 2008 - Continue on with standard, or. Skyhook equipped packing procedures. NOTE: At this point S,-V-fold bridle under flap #1 per proper packing.
Dec 6, 2009 - When you buy a Vector, you're buying more than a container system; you're buying innovation ... years of safe and enjoyable skydiving. ... The need for more security such as riser protection, pin protection and bridle protection.
abcd. ALSTOM (Switzerland) Ltd. HDST 601 100. Resposible寵epartment: Take櫥ver ...... according to the chart or, if necessary, select a thicker wall.
Dec 14, 1999 - briefing from a certified Instructor or Rigger for the type of equipment you ... Mandatory Service Bulletins repairs or modifications due to SAFETY ...
Dec 14, 1999 - Training and/or experience are required to lower the risk ..... the 7(/(6,6 should not be jumped until it has been inspected by a competent Rigger.
Wing chord incidence bar with "devil level" ... control pressures in long cross-country flights and in ... and aileron controls creates a hazard during cross-wind.
lbs(116kg). It is forbidden to use any ICARUS Reserve parachute with an exit weight exceeding the MAXIMUM EXIT WEIGHT for which each canopy is certified.Missing:
minutes away from the city center by bus. Contact. For more information and further details, please feel free to check out either http://www.i4cs-conference.org/.
less than the numbers in your operations manual. While it's questionable whether any of .... A calibrated cable tensiometer is a must for this task, and the adjust-.
approximately 1.5-2â inches in length using the double stow method. 3. Center locking stows are to be made before moving along to ... Close magnetic line stow.