CV Bonnichon Philippe

Windows NT4 Server administration (CNRS) ... Perform weekly reporting to IGXS manager ... site (VoIP, Networking, Servers, Workstations, Proceedings OLS). ... U1 to SF E6800 - Sun cluster 2.1 - Solaris 2.x – HPUX 10.x - EMC- Oracle 7.x …
1MB taille 84 téléchargements 295 vues
PHILIPPE BONNICHON

IT PROJECT MANAGER

14 rue St Exupéry 31120 Portet sur Garonne

GSM @mail

: 06 08 76 37 18 : [email protected]

MAIN SKILLS Cost Quality and Time management. Customer relationship management from pre-sales to final acceptance Teams management Risk analysis Conduct of meetings. Reporting. Writing of specifications sheet, tendering, quality assurance plan, subcontracting contracts ... Subcontractor selection and monitoring

TECHNICAL SKILLS / KNOWLEDGE Methods : ITIL v2 - GPP Software : MS Project, PowerPoint, Word, Excel, OpenOffice Operating System : UNIX (Sun Solaris 2.x, HP-UX 10.x et 11.x, Linux), Windows XP, NOVELL 3.x 4.x Backup tools : Time-Navigator, NetBackup, Arcservce, Veritas Volume Manager, Solstice Disk Suite Networks : ToIP, TCP/IP, IPX/SPX, NIS, NFS, CFT, Samba

EDUCATION 2009

English / Greta Toulouse

2007

Certification ITIL v2 : IT Service Management Foundation (based on ITIL)

2002

SUN Cluster 3.0 (SUN Microsystems)

2001

System and Network tuning under Solaris 2.x (SUN Microsystems)

2000

HP-UX (HP France) et Solaris (SUN Microsystems) administration

1997

Windows NT4 Server administration (CNRS)

1996

Maîtrise Informatique Systèmes & Réseaux – UPMC Paris VI (IT System and Network Master’s degree)

Philippe Bonnichon

IT Project manager Page 1 sur 4

PROFESSIONALS EXPÉRIENCES NOV 2010 TO MARCH 2011 :

AIRBUS

PROJECT MANAGEMENT OFFICER

Project Management Officer for Airbus IGXS Standard and Security service (ICT security solutions, standards and tools)  Analyze IGXS needs in accordance with the products roadmap. Purchase services to the subcontractor (Opportunity Study, study security solution, product upgrade replacement...)  Coordinate and monitor part of the subcontractor activities on IGX security products such as SafeguardEasy, SecurityBox ... (Packaging, L3 support, design and construction of new projects following the security process Airbus GPP).  Coordinate IGXS projects with other Airbus services involved in those projects.  Present and support requests for change at the weekly Change Advisory Board (CAB) committee  Represent IGXS in some Airbus projects needing support on security standards and policies or security tools  Perform weekly reporting to IGXS manager Technical Context : GPP-AAL-Magic- XPO7/XPLEg - McAfee HIPS - Arkoon SecurityBox - SGEasy…

DEC 2004 TO FEB 2009 :

ARES (SSII)

IT PROJECT MANAGER

Project management for industrial and banking clients during five years (PSA, La banque postale, Turbomeca, EADS, ....) On all the missions I was mainly responsible of  Cost, Quality and Time  Customer relationship management  Teams management  Premises inspection. Hardware and software delivery management  Conduct of technical and steering committees  Crisis management  Prepare negotiation for contract amendment with commercial  Review and validation of deliverables  Perform final acceptance with the client Main missions are described below : ASTRIUM-EADS, Toulouse (31) 2008 – 2009 / 3 months

Study and deployment of a high availability architecture including a VMWare ESX cluster with “boot on SAN” functionality and a RHEL5.x diskless workstation solution with access limitation to USB ports.  Attendance to pre-sales meetings  Technical team management (4 peoples) Technical Context : VMWare ESX – Redhat 5.x – Aix 5.3 – NetApp Fas3020 Philippe Bonnichon

IT Project manager Page 2 sur 4

TURBOMECA, Bordes (65) 2007 – 2008 / 8 months For a new U.S. factory (TURBOMECA MANUFACTURING) Turbomeca has requested the study, tests, validation and deployment of all IT infrastructure and assets needed to operate the new site (VoIP, Networking, Servers, Workstations, Proceedings OLS).  Coordination of the four French technical team  Monitor and validate subcontractor’s activities  Update project progress dashboard  Control of on-site hardware and software delivery.  Creation of a dedicated collaborative space (MS SharePoint) for - versioning, sharing and validating documentations - meetings scheduling - project plan sharing (MS Project) - project progress report  Planning and follow-up of technical team intervention in USA Technical Context : Windows 2003 Server - Windows 2000 WkS - HP Proliant DL360 - Cisco Call Manager 5.0SG - IP Phone 79xx - VLAN voice&data - PIX 515 - Catalyst 3750&3560 - BlueCoat Proxy

CROUS, Toulouse (31) 2007 / 2 months Study, integration, configuration and move into production of a centralized “DiskToDiskToTape” data storage and backup infrastructure (using TimeNavigator 4.1) Technical Context : HP Proliant ML350 - ADIC Scalar 24 library- EMC AX 150 storage

JETMULTIMEDIA, Lyon (69) 2006-2007 / 5 months Study, integration, tuning and move into production of a network and VoIP infrastructure (based on Cisco CallManager cluster and Cisco routers and switchs) for the new headquarter of the company. Users and administrator training on new tools (IP Phones and call manager)  Follow-up of Call manager settings study and validation  Organization of end-users training / network administrator training Technical Context : Cisco Call Manager 5.x - IPPhones Cisco 79xx - Geotaxe ES

PSA PEUGEOT-CITROËN, Paris (75) 2004-2006 / 18 months PSA rents its 9000 CAD Unix and Windows workstations to HP Financial and ARES (SSII) Rental stock is annually renewed by third and can increase of 500 to 1000 workstations every year

Philippe Bonnichon

IT Project manager Page 3 sur 4

The project consists in storage, configuration and on-site “just in time” delivering (28 factories in France) of 150 workstations per week according to the client order (type of workstation, number, deliver date, name and office of receiver…) Old workstations are destroyed (the sensitive industrial data must be destroyed)  Responsible for subcontractor selection / contract negotiation / Quality plan validation  Follow-up team's responsible of processing weekly client’s order (Workstations configuration and on-site delivering)  Follow-up of client purchase order and workstation delivery  Report the project activity to the client during the weekly steering committee.  Monitor subcontractor activity (agreement / KPI / Quality assurance plan, steering committees)  Conduct crisis meetings  Visit client factories every years to be aware of security process and to be accountable in case of accident of a team member. Sign prevention plan

1999 TO 2004 :

ASUR INFORMATIQUE (SSII)

UNIX SYSTEM ENGINEER

As Unix system engineer (Solaris, HPUX, linux) during 5 years I have worked on many system and infrastructure projects for major industrial and banking clients (Total, EDF, Dexia, Andersen Consulting...) : Architecture studies tests and validations - Integrations – Deployments – problems resolution… For the Unix infrastructure migration of a bank trading room : As project manager and Unix (Solaris) system architect I have conducted the architecture study, written the architecture guide (compliant with client SLA and OLA), built the mock-up, written test cases dossier, run tests, validated the final architecture and moved it into production. For EDF I have realized many Unix architecture studies : High Availability servers, backup servers/architecture, jumpstart server on multi VLAN, servers update and upgrade (HP, SUN and Bull/IBM)... I have also developed and put into production a tool for installation and configuration of a secured version of Solaris 2.7 and 2.8 for DMZ (using Jass, sudo...) Technical Context : Sun U1 to SF E6800 - Sun cluster 2.1 - Solaris 2.x – HPUX 10.x - EMC- Oracle 7.x …

1996-1999 :

MINISTRY OF RESEARCH

SYSTEM ENGINEER

Administration and Operation of the servers, workstations, software and assets of the Executive Research Department (200 users) Technical Context : Novell 3.x / 4.x, Windows 98, Windows NT4, Arcserve, MS Office, …

Philippe Bonnichon

IT Project manager Page 4 sur 4