Service Bulletin

Model Code : NCP1#, NCP2#, NCP3#, NCP4#, NCP61, NLP10, NLP2#, ... Aug.,1999. NCP2#,NLP2#,. Aug.,1999 ... Aug.,2002. NCP4 ... Sep.,2002 ... Aug.,2003.
157KB taille 1 téléchargements 55 vues
Section :

Engine

Ref. No. : EG-5003

Service Bulletin

Date : Page :

Feb.,2005 1 of 3

Area Application : USA, Canada, Europe, General, G.C.C. Countries, Australia Model Name : YARIS, YARIS VERSO, ECHO, ECHO VERSO, COROLLA, COROLLA MATRIX, COROLLA VERSO, PRIUS, SCION xA, SCION xB, LAND CRUISER 100, SEQUOIA, TOYOTA TUNDRA Model Code : NCP1#, NCP2#, NCP3#, NCP4#, NCP61, NLP10, NLP2#, NHW11, VCK30, VCK40, UCK3#, UCK4#, ZZE12#, ZZE13#, HDJ10#, FZJ10#, HZJ105, UZJ100, CE12# Subject : Instructions regarding exhaust pipe joint clamp installation angle This service bulletin provides instructions regarding the exhaust joint clamp installation angle. When installing the exhaust joint clamp, the following instructions must be followed.

Part No. Information : New Part No.

New Part Name

Qty

NA

NA

NA

Production Effective : Model Code

Production Date

NCP1#,NLP10,

Aug.,1999

NCP2#,NLP2#,

Aug.,1999

NCP61

Apr.,2003

NCP1#

Aug.,2002

NCP4#

Mar.,2003

NCP2#,NCP3#,NLP2#

Aug.,2002

NCP1#,NLP10

Aug.,2002

NLP10

Feb.,2003

NZE120,CE120,ZZE12#

Oct.,2001

NZE12#,ZZE12#,CE121

Sep.,2002

ZZE13#

Jan.,2002

NHW11

May.,2000

VCK30,VCK40,UCK3#,UCK4#

Aug.,2002

FZJ10#, HZJ105,UZJ100, HDJ10#

Aug.,2003

UCK3#, UCK4#

Sep.,2003

OVERSEAS CUSTOMER SERVICE TECHNICAL DIV.

Service Bulletin

Ref. No. : EG-5003 Page :

2 of 3

INSTALLATION 1.

NCP1#, NLP10, NCP2#, NLP2#, NCP61, NCP4#, NCP3# : INSTALL EXHAUST PIPE ASSEMBLY TAIL (a) Install a new gasket onto the exhaust pipe front. (b) Install the new clamp with the bolt as shown in the illustration. NOTICE: Do not reuse the removed gasket and clamp. Torque: 32 N·m (326 kgf·cm, 24 ft.·lbf)

2.

NHW11 : INSTALL EXHAUST PIPE ASSEMBLY TAIL (a) Install a new gasket onto the exhaust pipe front. (b) Install the new clamp with the bolt as shown in the illustration. NOTICE: Do not reuse the removed gasket and clamp. Torque: 32 N·m (326 kgf·cm, 24 ft.·lbf)

3.

VCK30, VCK40: INSTALL EXHAUST PIPE ASSEMBLY TAIL (a) Install a new gasket onto the exhaust pipe front. (b) Install the new clamp with the bolt as shown in the illustration. NOTICE: Do not reuse the removed gasket and clamp. Torque: 32 N·m (326 kgf·cm, 24 ft.·lbf)

4.

ZZE12#, CE12#, NZE12#, ZZE12# : INSTALL EXHAUST PIPE ASSEMBLY CENTER (a) Install a new gasket onto the exhaust pipe front. (b) Install the new clamp with the bolt as shown in the illustration. NOTICE: Do not reuse the removed gasket and clamp. HINT: Both available right and left side. Torque: 32 N·m (326 kgf·cm, 24 ft.·lbf)

UPPER

RH 55.5°+20° -20° A111553E01

UPPER

RH 90°+20° q A111549E01

UPPER 30°+30° -0° RH

A111556E01

UPPER

RH 90° A111552E01

OVERSEAS CUSTOMER SERVICE TECHNICAL DIV.

Service Bulletin

Ref. No. : EG-5003 Page :

3 of 3

5.

FZJ10#, HZJ105, UZJ100, HDJ10#:INSTALL EXHAUST PIPE ASSEMBLY TAIL (a) Install a new gasket onto the exhaust pipe center. (b) Install the new clamp with the bolt as shown in the illustration. NOTICE: Do not reuse the removed gasket and clamp. Torque: 35 N·m (357 kgf·cm, 26 ft.·lbf)

6.

ZZE13#:INSTALL EXHAUST PIPE ASSEMBLY TAIL (a) Install a new gasket onto the exhaust pipe center. (b) Install the new clamp with the bolt as shown in the illustration. NOTICE: Do not reuse the removed gasket and clamp. Torque: 32 N·m (326 kgf·cm, 24 ft.·lbf)

7.

UCK3#, UCK4#: INSTALL EXHAUST PIPE ASSEMBLY TAIL (a) Install a new gasket onto the exhaust pipe center. (b) Install the new clamp with the bolt as shown in the illustration. NOTICE: Do not reuse the removed gasket and clamp. Torque: 32 N·m (326 kgf·cm, 24 ft.·lbf)

UPPER 30° RH

A111555E02

UPPER

RR

40.1°+10° -10°

A111550E01

UPPER

RH 30° A111554E01

OVERSEAS CUSTOMER SERVICE TECHNICAL DIV.