Regional Centre for Low-Cost Water Treatment

Regional Water Centre (CREPA). Built Area: 1'052 m² ... Logement. Atelier de reparation. Foyer de reception. 4106. Logement. 0. 1000. Parking deux roues.
2MB taille 2 téléchargements 246 vues
Regional Centre for Low-Cost Water Treatment Ouagadougou, Burkina Faso

Architect:

Fourmouzéré Adama Zala

Client:

Regional Water Centre (CREPA)

Built Area:

1’052 m²

Cost:

US$ 293’936

CREPA is an organisation concerned with the low-cost provision of safe and clean water. It brings together 17 member states in Africa, from Benin and Burkina Faso to Senegal and Togo. This complex, sited in a diplomatic enclave, provides an administrative headquarters as well as a research centre. It has four components: main building (containing offices, meeting rooms, archives, library and cafeteria), training centre, guard-post and enclosing wall. The principal construction materials are compressed earth blocks, sand-cement tiles and red wood, treated against insects.

3173.BOU 2007 Award Cycle

Le Prix Aga Khan d’Architecture /

PANNEAU DE PRESENTATION N° 1

NORD

NORD

Batiment F2 Bureaux Logement

Logement

500

285

Fourmouzéré Adama Zala Ouagadougou, Burkina Faso

Entrée principale

Plafond

Bardage

Chef de service 3

Chef de service 2

Bibliothèque

60

Logement

COUPE BB

Echelle:

0

2

1

4

3

5m

1180

1700

Regional Water Centre (CREPA) Ouagadougou, Burkina Faso

Ferme

350

885

30 205

Groupe electrogene

Locaul des techniciens

Lattes de 4x4

Tuile en MV

Mezzanine

230

Hangard servant de debaras

240

Logement

Atelier de reparation

BATIMENT PRINCIPAL

Parking voitures

Commission

1995 - 1997

Design Construction

1998 - 1999 n.a.

Occupancy

1999

Site

7’900 m

Ground Floor Total Floor

1’034 m 1’052 m2

Costs

US$ 293’936

Programme

CREPA is an organisation concerned with the low-cost provision of safe and clean water. It brings together 17 member states in Africa, from Benin and Burkina Faso to Senegal and Togo. This complex, sited in a diplomatic enclave, provides an administrative headquarters as well as a research centre. It has four components: main building (containing offices, meeting rooms, archives, library and cafeteria), training centre, guard-post and enclosing wall. The principal construction materials are compressed earth blocks, sand-cement tiles and red wood, treated against insects.

Apatam (cafeteriat)

Foyer de reception

1180

442

FACADE OUEST Guerite

Guerite

2

1000

Salle de formation

Entrée

Salle de formation

Echelle:

0

2

1

4

3

5m

Entrée

2 Parking voitures

D

FACADE EST

crepa

13,95m²

Toilette 4,36m²

FACADE PRINCIPALE( NORD) 1

2

3

COUPE E-E Echelle: 0

260

234

5m

FACADE SUD

Echelle:

0

2

1

4

3

5m

TN

COUPE FF

450

PLAN DE NIVEAU 1

2

3

4

0

1

2

3

4

5m

155

0

Echelle:

E

41.37m²

5m

376

234

4

3

Echelle: Terrasse

4

143

660 2

1

Sécretariat 16.99m²

3

57

137 311

Terrasse 6.52m²

2

1

±0.00

45

725

12.53m² Guerite

F

880

99.15m²

681

Salle de formation

100 120 20 60

80 220

340

Bureau

Terrasse 6.52m²

0

GUERITE

436

137

1435

275

E 2.80m²

Echelle:

5m

4

99

0

220

Echelle:

30

60

TN

5m

CREPA

F

2 430

12.44m²

4

3

B

C

Terrasse

SALLE DE FORMATION

17.60m²

2

1

Chef de service 3

4106

Bureau

Echelle:

0

60

60

Patio

COUPE AA

24,17m²

13,84m²

Standard 5m²

PLAN DE NIVEAU

2.80m²

Escalier bois Bibliothèque 15 15

635

Salle de reprographie 7,97m²

Directeur

Coursive

D

Patio

TN

Tuile en MV

20

Secretariat

16,46m²

Degagement

Degagement

117

Bureau 6

17,81m²

Entretien

Cheneau

5 R7

255

14,34m²

A

Ferme

Degagement

Attente

Bureau 5

5m

100

Chef de service 4

54,67m²

116,82m²

Degagement

Archives 10,46

Ferme

225

Documentation 11,46

Bibliotheque avec mezzanine

1719

Patio 47,55m²

70,69m²

4

3

Lattes de 4x4

2465

350

19,14m²

Degagement

Patio

7,25m²

2

1

586

Faitière

14,08m²

213

18,59m²

Degagement

Entretien

0

2785

Chef de service 2

Bureau 4

Bureau 3

17,88m²

615

100

9,76m²

Bureau 2

Salle de conference

Echelle:

292

7,39m²

23,50m²

11,01m²

1705

Cafetariat

14,08m²

Rangement

A

17,18m²

10m

100

C

Dam

Bureau 1

Chef de service 1

5

0

3362

Coursive

Homm

Echelle:

885

BATIMENT PRINCIPAL

745

PLAN DE MASSE du projet tel qu'il est aujourd'hui

10m

239

5

0

280

Echelle:

B

PLAN DE MASSE (avant la réalisation du projet)

87

Parking deux roues

114

Clients

3173.BOU

39°

Secteur 27 ; Rue Naaba Kiba Boulsa; Porte n°441 Ouagadougou, Burkina Faso Architects

CYCLE 2007 /

225

Regional Centre for Low-Cost Water Treatment

650

Building Type 2007 Award Cycle

8 3173.BOU

280

1 500

PLAN DE NIVEAU

FACADE OUESTEchelle: 0

1

2

3

4

5m

FACADE NORD Echelle: 0

1

2

3

4

5m

FACADE GAUCHE

Echelle:

0

1

2

3

4

5m

FACADE PRINCIPALE

5m

CYCLE / Le Prix Aga Khan d’Architecture / 2007 PANNEAU DE PRESENTATION N° 2 IMAGES DU PROJET LORS DE LA REALISATION

1 Image n° 1 : Début du chantier

5

2

IMAGES DU PROJET tel qu’il est aujourd’hui

3

4

Image n° 2 ; 3 ; 4 : Détail de la charpente montrant l’assemblage des chevrons ainsi que la pose du grillage à petites mailles et du film polyane.

6

7

Image n° 8 : Vue de la guérite

9

11 Image n° 11 : Portail d’entrée du site

Image n° 5 ; 6 ; 7 : Etat d’avancement général des travaux.

8

Image n° 12 : Une vue de la Guérite

Image n° 13 : Bâtiment principal vu à partir du portail d’entrée

15

17

Image n°9 ; 10 : Vue intérieure du bâtiment principal montrant les détails des fenêtres.

Image n° 20 ; 21: Façades Est et Nord (enduites de vernis) de la salle de formation

13

16 Image n° 16 : Entrée du bâtiment principal

Image n° 14 ; 15 : Bâtiment principal pris dans son contexte

10

21

12

14

Image n° 17 : Hall d’entée du bâtiment principal ; le logo du CREPA y est représenté.

23 20

3173.BOU

22 Image n° 22: Salle de formation pris dans son contexte actuel

Image n° 23: Bâtiment F2 à usage de bureaux

18

19

Image n° 18 ; 19 : Vue du dégagement et du grand patio

24 Image n° 24: Détail du bâtiment principal montrant la gouttière ainsi que les tuyaux conduisant l’eau de pluie qui vers de grands réservoirs.

25 Image n° 25: Vue intérieure des toilettes

3173_DR