Instructions for installation of m2 AAD into the container PARATEC
the device m2 on and off as a check, according to the device manufacturer ... Insert the body of device m2 (control unit) into the small pocket on the bottom of ...
Instructions for installation of m2 AAD into the container PARATEC - NEXT
M2 AAD
Step 1 Check carefully the whole device, control unit, cutter and cables to be sure that they are not damaged. Switch the device m2 on and off as a check, according to the device manufacturer instructions. Warning! No force-pulling of cables, distortion, twisting or sharp bending of cables during the installation! Minimum diameter of cables loops must be at least r = 25mm. The device cables must not be placed under the metal device body in the small pocket designated for the device body (control unit). Step 2 Insert the body of device m2 (control unit) into the small pocket on the bottom of reserve parachute container as deep as possible so that cables outputs from the device body are as close as possible to the bottom of reserve parachute container. (Fig. 1, 2, 3, 4) Fig.1
Fig.2
Fig.3
Fig.4
Step 3 First place the thin cutter cable on the bottom of the small pocket of device m2 and wind it in maximum possible loops clockwise. (Fig.5) Fig.5
Step 4 Run the cutter body through the sleeve sewn on the right side flap of reserve parachute container and insert it into the elastic loop. The cutter opening for threading of the closing loop must be in the same place (same axis) as the flap grommet. Make sure that the cutter cable is not too tight – ensure it is loosened a little. (Fig.6, 7, 8)
Fig.6
Fig.7
Fig.8
Step 5 Place the control unit cable on the thin cutter cable and wind it again in maximum possible loops anticlockwise. (Fig.9) Run the control unit through the sleeve on the bottom of reserve parachute container towards the container collar. (Fig.10, 11) Fig.9
Fig.10
Fig.11
Step 6 Insert the control unit into the small transparent pocket of back pad. Make sure that the cable is not too tight. Ensure it is loosened a little. (Fig.12, 13)
Fig.12
Fig.13
Fig.14
Step 7 By means of Velcro close the small pocket with inserted control unit of the device m2. (Fig 15, 16)
Fig.15
Fig.16
Step 8 Check the functionality of the device m2 by switching it on, according to the manufacturer instructions. (Fig.17) Fig.17
The manual owner is obliged to record any notified changes in the List of .... strap is sewn with the reserve parachute's upper flap and closing flap, the former ...
1. Packing the sky Hook into the Vortex container Sport and Military systems ... Figure 1. Figure 2. Make s folds on the bridle from the top edge of the free bag till ...
Aerodyne Research, LLC has tested the fit of the Mars M2 AAD in the. Icon harness and container systems. We have determined that the device, when properly ...
2.0.2.5. Close Velcro around s-folded line, making sure not to catch the line in the velcro. Mate toggle and riser. 2.0.2.6. Repeat procedure on the opposite riser.
2. Carefully unpack your new fixture and lay out all the parts on a clear area. Take care not to lose any small parts necessary for installation. MOUNTING THE ...
At this point, connect the electrical wire as shown in Fig. 2, making sure that all ... Place the glass over the socket and secure by turning clockwise. Return the ...
Shut off the power at the circuit breaker box (avertissement! couper le courant au ... the cross bar with the green screw provided. 5. Tuck these wire connections ...
HORS TENSION ET ISOLÃ DE LA TENSION DU. CIRCUIT AVANT DE MONTER OU DE DÃMONTER. LE DISPOSITIF DE VERROUILLAGE. m PRECAUCIÃN. TODOS LOS TRABAJOS ELÃCTRICOS SE DEBEN. REALIZAR POR UN ELECTRICISTA CALIFICADO. PARA ELIMINAR EL RIESGO DE DESCARGA,.
installation side with a contact opening of at least 3mm with regard to satisfying the ... The following opening dimensions in feet must be available in the.Termes manquants :
installation side with a contact opening of at least 3mm with regard to satisfying the ... The following opening dimensions in feet must be available in the.Termes manquants :
installation side with a contact opening of at least 3mm with regard to satisfying the necessary .... Slide the microwave oven part way into the cabinet opening. 2.
only be turned off by pulling out the mains plug or appropriate circuit breaker (upstream automatic fuse). ELECTRICAL CONNECTION. Once the oven is securely ...
In case of necessity to change or amend this manual, the holder will be ... Chapter. Sheet nos. with Changes. Date of. Issue of. New. Sheets. No. of the ..... Packing of the main canopy is carried out according to technical description of the.
Neue Wege der Ontologie / W. Kohlhammer, 1949 - 115 s. (De). 77. Hegel, Georg. Grundlinien Der Philosophie Des Rechts / Berlin, 1821. â 355 S. (De). 78.
It contains explanations that will be useful to the airport security staff. ... A skydiver should always adhere to all rules and regulations set by his/her ..... you must switch OFF your Vigil® II before travelling in a closed vehicle (car, bus, tra
visto por otros] y tuberÃa de drenaje) para desa- lojar el condensado. 3.Fije el ventilador al soporte de montaje mediante los tornillos de hojalata suministrados.