for balanced cantilever construction spans 30.5 to 61.0 meters cc
FOR BALANCED CANTILEVER CONSTRUCTION. SPANS 30.5 TO 61.0 METERS. C. C. 'X. ' M ale. Keys. Sp a. @. 160. = 'Y'. 314. 'X. ' M ale. Ke ys. Sp a. @. 16.Missing:
2. Post-tensioning layouts for balanced cantilever construction using these standards shall utilize the duct and anchorage locations shown. Details shall be in acccordance with the "Recommended Contract Administration Guidelines for Design and Construction of Segmental Concrete Bridges".
210 5 @ 130
296
240 (Typ.) 118 (Typ.)
C
38 mm Duct for 25 mm
600
155
15 (Typ.)
118 (Typ.)
240
C
s Key ale ' 'X' M 60 = 'Y @1
. Spa
Shear Key Occurs only when Deck Width is 10,350 mm or Greater.
(Typ.)
314
A
380 380 (Typ.) (Typ.)
15 (Typ.)
155 (Typ.)
113 (Typ.)
600
210 5 @ 130
(Typ.)
2,950 210 5 @ 130
Varies
3,550
Shear Key Occurs only when Deck Width is 12,750 mm or Greater.
'X' M ale Spa Key . @ s 160 = 'Y '
Varies
1. Unless otherwise noted, all ducts are 90 mm diameter for 12 x 15mm diameter or 15 x 13 mm diameter strand tendons.
Contract Special Provisions. Angular intersections of formwork shall have a minimum radius of 50 mm. Slab and box edges shall have a minimum chamfer of 20 ...
212. 219. 251. 259. 98. 95. 120. 117. 143. 139. The weight given is for the diaphragm only. The Total segment weight is the weight of the diaphragm plus the ...
Unnatural. Test. Will Power + Cool. Fellowship + Cool. Initiative + Cool. Intelligence + Cool. 1. Lying to your best friend. Getting locked up in the stocks for a night.
Oct 12, 2006 - For minimum, medium, and fast flow-rates, the following were noted: Actual flow rate ... 1 to 5, have been put below in Graph 1. 10. 20. 30. 40.
Jan 26, 1970 - was made of upper and lower. "booms" or ... under the legs to level up the table, but if we were ... to allow for cleaning up the sur- faces with a ...
Protection contre l'inversion. Intégrée de polarité. • Délai de préchauffage. 5 minutes. Connexion. • Câble intégral. 4 fils x 0.34 mm2 [22 AWG], blindé. Gaine.
and assembly of cantilever spars or beams, starting from raw wood through to the assembly of the ac- tual wing. ..... against it. The plane iron will need frequent ...
Jul 10, 1970 - trying to pull itself apart at the hub with a force of over 30,000 lbs. And this considers only the centrifugal for- ces. Bending and twisting stresses ...
They propose a three-layered structure for the four perspectives: mission (e.g., to become the cus- ... translate this definition into concrete questions: âHow do the suppliers of finance get managers to .... Analysis Report. Gartner Group, 22 June
Jul 10, 1970 - by Stanley A. Hall (EAA 10883) ... sidered and with the test data upon ..... 3000-. 2.500-. 1000-. 1500 --150. 1000 - 100. 40. Static rpm, cruise ...
steps which would create a high stress concentration at the .... face" refers to the top normal to the spar; "lowermost" or .... Draw a pencil reference line across the ...
two inputs and thus permits fast and simple comparison between signals or connection of ... As a result of PALMER's policy of continuous product improvement, tech- ... product type: switcher type: passive switching function: input switcher number of
Vis du protège-plâtre Tornillo de placa de. (3/16" -24 * 2-3/16" L) (3/16 po -24 *. (3/16 pulg. -24 *. )L .glup 61/3-2. )L op 61/3-2. 9. Plaster Guard. Protège-plâtre.
FERRULE: PINCE A SERTR M22520/501 (RAD ALL 282 297). MACOREM 22.520 5.05 (RADALL 282 246) HEX 5,41 PLATS. Eiii. S. E. is it is. Siitiitiii.;; it is it is is ...