environmental charter 2006-2011 - CAPSSA

passengers and establish a policy for the development of public transport (personnel shuttle ... What are the Measures for Noise Management? Objective 5 To ... 16. Improve the Riviera trajectory by following the Code of Good. Conduct. WHEN. WHO BY ... Study on the new building project for reclassification areas. (HQE).
934KB taille 4 téléchargements 274 vues
- 1-

ENVIRONMENTAL 1CHARTER 2006-2011

- 2-

What Measures are being taken to Preserve Air Quality? Objective 1

To reduce emissions – road traffic

WHEN

WHO BY

2011

CCI

2011

CCI

2006

CCI

Objective 2 To reduce emissions – aerial traffic 4. Feasibility/advantage study of motorised taxiing or other solutions to reduce the emissions of aircraft on the ground. Indicator: Conclusion of the Study

2008

DGAC

5. Establish a policy initiative for the reduction of emissions on the ground: in favour of 400Hz Indicator: real/ proposed rate for utilisation of 400Hz

2007

CCI

Objective 3 To measure pollution and communicate results more effectively

2008

CCI

2006

CCI

2007

CCI

2006

GTAIR

1. Develop the car parking facilities for clean vehicles (ANCA) according to costs and technologies. Indicator: ratio of clean vehicles/ total fleet (50% in 2011) 2. Set up a non-polluting link between Terminal 1 and Terminal 2 3. Study traffic flow: map the movements of personnel and passengers and establish a policy for the development of public transport (personnel shuttle, shared vehicles, tramway, hydrogen…)

6. Include an indicator in the monthly bulletin on the data from the ANCA monitoring station 7. Continue to evaluate pollution at the airport: indicator OCEAN (LTO over 3 years) Objective 4 To study the emission of pollutants and their impact on health in the most comprehensive way possible 8. Conduct research on the impact of airport pollution on health (list of studies) ¬ 8.1 List of Studies in 2006 ¬ 8.2 Synthesis of major trends 2007 9. Draw up the Airport’s carbon account: keep a register of emissions to view sources of pollution. (CANCA: ADEME pilot site for a region’s carbon account).

2007

2006

ENVIRONMENTAL 2CHARTER 2006-2011

CCI

- 3-

What are the Measures for Noise Management? Objective 5

To Manage Night Flights

10. Study of Night Flights according to a balanced approach (The study begins with current economic impact and its evolution) ¬ 10.1 Ratification of the terms and conditions of the study by the permanent committee on 6 April 2006 ¬ 10.2 Realisation of the study (2006) ¬ 10.3 Submission to the CCE (2007) 11. Annual Report on the implementation of the Code of Good Conduct (…) by the signatories Objective 6

To Improve Methods of Noise Abatement

12. Annual Report on the integration of ILS noise abatement procedures in the operations manuals of companies signed up to the Code of Good Conduct. 13. Submission of the ACNUSA study on setbacks Objective 7

WHO BY

2006 2007

CCI

2006

CP

2006

Cabinet ext.

2007

CCE

20062011

Signatories of the CBC

20062011

Aerial Co. Signatories of CBC

To Limit the Noisiest Helicopters and Airplanes

14. Create an overall noise indicator ¬ By site ¬ With Noise Guarantees ¬ To compare noises measured Objective 8

WHEN

DGAC

2006

CCI/ DGAC

To optimise the Riviera procedure

15. To increase its rate of use where conditions permit ¬ 15.1 Establish a Riviera possible/ Riviera used indicator with analysis in the case of significant divergence (to be determined in consultation) ¬ 15.2 Communicate using a number of movements indicator 16. Improve the Riviera trajectory by following the Code of Good Conduct

ENVIRONMENTAL 3CHARTER 2006-2011

CCI/ DGAC

2006

DGAC

2006

CCI

20062011

Signatories CBC

- 4-

What are the Measures for Noise Management? Objective 9 To relocate Kilo Park management in its immediate vicinity 17. To continue the non-noisy use of the preparation areas for planes in the Kilo Park Objective 10 To envelopes

respect

departure

WHEN

WHO BY

2006-2011

CCI

2006

CCI

2006

CCI

2006

CCI/DGAC

2006

CCI/DGAC

2006-2007

CCI

2007

GT bruit & GT Com.

trajectory

18. To respect flight altitudes ¬ 18.1. systematic analysis of flight altitudes of planes flying over the coast ¬ 18.2 Indicator in the monthly bulletin: number of flights per altitude segment (less than 6 000ft, over 6 000 ft and less than 10 000 ft and over 10 000 ft), segments to be adapted according to the measurements obtained. ¬ 18.3 to measure and analyse noise levels ¬ 18.4 to put the measuring campaign into action using the mobile sensor in the towns of Cagnes sur Mer and Saint Laurent du Var Objective 11 To limit the disturbance caused by the sonic bird repellent system 19. Put a new system of norms into place Objective 12 To integrate our monitoring in our consultation work

technological

20. To organise a yearly talk, at a CCE meeting, of 1 hour maximum, by a specialist on a subject that will help us to develop our work.

ENVIRONMENTAL 4CHARTER 2006-2011

- 5-

What are the Measures for Energy Management? Objective 13 To develop renewable energies WHEN

WHO BY

21. Install solar energy in function of the costs and technologies for new buildings or renovated buildings Indicator: clause stipulation

2006

CCI

22. To include HEQ (High Environmental Quality) clauses in all new construction or renovation projects

2006

CCI

2006

CCI

2006

CCI

For the production of hot water

23. Draw up a consolidated energy account of all ANCA buildings 24. Establish a plan of action following the consolidated energy account

ENVIRONMENTAL 5CHARTER 2006-2011

- 6-

What are the measures for Waste Management? WHEN

WHO BY

2006

CCI

2007

CCI

28. For the public area ¬ 28.1 door to door collection for bulky items ¬ 28.2 common waste disposal centre project established in association with MIN

2007

CCI

2007

CCI

29. Study on the new building project for reclassification areas (HQE)

2009

CCI/ CANCA

2006

CCI

2007

CCI

2007

CCI

Objective 14 Intensify selective sorting in public areas 25. Explore a partnership with CANCA for the triple compartment rubbish bins in the terminals 26. If the preceding measure is not possible, install twocompartment rubbish bins Objective 15 Set up a waste disposal centre (dangerous, bulky waste or wood) 27. For the restricted area: waste disposal centre

Objective 16 Decrease the volume of supplier packaging 30. Draw up provisions with the purchasing department 31. Draw up provisions with the commercial and estate department

ENVIRONMENTAL 6CHARTER 2006-2011

- 7-

What are the measures for the Management of Natural Resources Objective 17 To Manage our consumption of water 32. To return air-conditioning water to the groundwater 33. To re-use air-conditioning water in the watering of our green spaces while at the same time returning it to groundwater 34. To develop a policy for using innovative techniques

WHEN

WHO BY

20062008

CCI with DRIRE DDASS/ DDAF CCI

20062008 2006

CCI

2006

CCI

2007

CCI

2007

CCI

2007

CCI

2006

CCI with DRIRE DDASS. DDAF CCI with DRIRE DDASS. DDAF

Objective 18 To care for our natural heritage 35. To preserve the building/ vegetation ratio ¬ 35.1 draw up a tree charter ¬ 35.2 draw up a landscape management plan 36. Study the aquatic biodiversity 37. Draw a map of the biodiversity (birds, insects, parasites, mammals…)

What are the measures for environmental hazards management? Objective 19 To improve jet fuel distribution 38. Research a new less harmful fuelling method for the petrol depot 39. Start up this new fuelling method

2011

ENVIRONMENTAL 7CHARTER 2006-2011

- 8-

What Consultation, Communication & Community Involvement activities? Objective 20 To fit the airport to its environment 40. To Organise an airport job forum 41. To be a relay of information on aerial transport (TNSA, solidarity tax, school visits) 42. To promote partnerships linked to the aeronautical environment 43. To produce a guide to good environmental practice for ANCA staff Objective 21 To make the charter a more accessible document

WHEN

WHO BY

2007

CCI

2006-2011

CCI

2006-2011

CCI

2007

CCI/GT/ COM

2006

CCI

2006

CCI

2006

CCI

2006

CCI

2006-2007

CCI

2007-2011

CCI

2006

GT-Com

2006

GT-Com

2006-2010

CCI

Oct. 2006

GT-Com

2006-2010

CCIjournalist 3DCNOAss. CASA-coll.

44. Redo the charter graphics with the bee 45. Create more striking graphics 46. Print it in two languages (F and GB) Objective 22 Make the Charter into a living document 47. Produce a booklet of contextual quotations and general data accompanied by a thematic policy ‘roadmap’ in the form of cards (which are easier to produce) 48. Study a numerical breakdown (CD…) 49. Assemble an annual monitoring committee integrated with the CCE Objective 23 To make the CCE’s activities known 50. List the support measures for towns (who, to whom, how much, frequency, objectives) (CCE, CF CG, Le Cannet, Agglomeration Community) 51. Plan publications and their subjects 52. Develop a communication plan through ANCA. (the associations’ publications are planned for a later date if the associations request this) 53. Write an advertorial on the Report on the 2000/20005 charter and the undertakings of the new 2006/2011 54. Information on the members of the colleges of the CCE

ENVIRONMENTAL 8CHARTER 2006-2011