Antares Status report Antares Status report .fr

Jun 11, 2006 - 100 Mbit/s. Power. ARS card x 3. Ethernet 100 Mbit/s → 1 Gbit/s. Optical beacon ... been removed. You can get them on the web : http://antares.in2p3.fr ... Considered within the KM3Net « design study » : 9 M€. 2006-2009.
2MB taille 3 téléchargements 394 vues
http://antares.in2p3.fr

Antares Status report

Th. Stolarczyk CEA Saclay, Dapnia 11/06/2006 – C R I S

On behalf of the Antares collaboration Th. Stolarczyk – CEA/Dapnia

1

Antares collaboration

Since 1996 6 countries 22 laboratories 200 technicians, engineers, sea scientists, physicists. 11/06/2006 – C R I S

Th. Stolarczyk – CEA/Dapnia

2

La Seyne sur Mer

11/06/2006 – C R I S

Th. Stolarczyk – CEA/Dapnia

3

350 m

100 m

-2500 m

≈ 60 m

11/06/2006 – C R I S

12 lines 3x25 PM Th. Stolarczyk – CEA/Dapnia

4

11/06/2006 – C R I S

Th. Stolarczyk – CEA/Dapnia

5

900 optical modules

σTTS ≈ 1.3 ns

11/06/2006 – C R I S

Th. Stolarczyk – CEA/Dapnia

6

ARS card x 3

Acquisition - FPGA - VxWorks - 100 Mbit/s

Clock 20 Mhz (50 ns)

Compass, tiltmetres

Power

Overview of a local control module (LCM) 11/06/2006 – C R I S

Ethernet 100 Mbit/s → 1 Gbit/s Optical beacon, hydrophone… Th. Stolarczyk – CEA/Dapnia

7

Back to History 1996 - 2000

2001- 2003

2005 operations Oct. 2001 40 km cable

Environment studies

Dec. 9th 2002 Junction box

Dec. 1998 Site exploration (300 x 300 m2)

March, 17th Mechanical test

March, 18th MILOM (optical modules)

Dec. 23rd 2002 Sector line + MIL Nov. 1999 7 PM demonstrator

April 12th Connection with VICTOR

March 17th 2003 Connections with Nautile 11/06/2006 – C R I S

Th. Stolarczyk – CEA/Dapnia

8

(Since march 2005)

3 Optical Modules

15m

Buoys

Acoustic Doppler Current Profiler (ADCP)

MILOM Acoustic Positioning Transducer

100m

15m

50m

LED beacon

Storey 3

Storey 2

Storey 1

Bottom String Socket 11/06/2006 – C R I S

Th. Stolarczyk – CEA/Dapnia

9

MILOM – Sea currents ADCP: Acoustic Doppler Current Profiler

11/06/2006 – C R I S

Th. Stolarczyk – CEA/Dapnia

10

MILOM – Line movements

11/06/2006 – C R I S

Th. Stolarczyk – CEA/Dapnia

11

MILOM Optical background 2 mn

11/06/2006 – C R I S

3 months Th. Stolarczyk – CEA/Dapnia

12

Correlation of water current and burst fraction

11/06/2006 – C R I S

Th. Stolarczyk – CEA/Dapnia

13

MILOM : Time resolution (Electronics contribution)

σ ~ 0.5 µ ns− µ rec

µ rec −ν

PMT

true

14.5 m

µ LED beacon

ν

∆t [ns] 11/06/2006 – C R I S

Th. Stolarczyk – CEA/Dapnia

14

MILOM : acoustic resolution

2 cm

Distance between 2 fixed points

2 months

11/06/2006 – C R I S

Th. Stolarczyk – CEA/Dapnia

15

MILOM : Data from seismometer ~ 150 m away from the MILOM.

Lavandou (France) Feb. 9, 2006 Mozambique Feb. 22, 2006 11/06/2006 – C R I S

Th. Stolarczyk – CEA/Dapnia

16

Line 1 In order to reduce the size of this file, high definition line 1 pictures have been removed. You can get them on the web : http://antares.in2p3.fr

11/06/2006 – C R I S

Th. Stolarczyk – CEA/Dapnia

17

Connected : March 2nd, 2006, 12h11

(picture taken in march 2005 – MILOM connection)

11/06/2006 – C R I S

Th. Stolarczyk – CEA/Dapnia

18

LED beacon Time Calibration (Electronics + diffusion contributions)

σ = 2.6 ns

σ = 0.7 ns

~70 m MILOM 11/06/2006 – C R I S

Line 1 Th. Stolarczyk – CEA/Dapnia

19

Line 1 – sea currents High value of sea currents → High bioluminescence activity Seasonal effect ? - seen on sector line (2003) - seen on MILOM (2005)

11/06/2006 – C R I S

Th. Stolarczyk – CEA/Dapnia

20

Line 1 shapes (acoustic data) Current speeds : 4 , 12 , 15 , 26 , 32 , 33 cm.s-1 Low current speed

11/06/2006 – C R I S

High current speed

Th. Stolarczyk – CEA/Dapnia

21

Muon reconstruction On shore data filtering Local trigger L1 : coincidence < 20 ns on storey At least 4 L1 in coincidence → « Physics event »

A single line → poor sensitivity to azimut → use 4 parametre χ2 fit c(t i − t 0) = (zi − z0) ⋅ cos θ + tgθc ⋅ d 2 + (zi − z0)2 sin 2 θ 11/06/2006 – C R I S

Th. Stolarczyk – CEA/Dapnia

22

z [m]

21240 / 12527 o θ = 172

Triggered hits Hits used in fit + Snapshot hits

t [ns] 11/06/2006 – C R I S

Th. Stolarczyk – CEA/Dapnia

23

z [m]

21240 / 13212 o θ = 147

Triggered hits Hits used in fit + Snapshot hits

t [ns] 11/06/2006 – C R I S

Th. Stolarczyk – CEA/Dapnia

24

z [m]

21240 / 12527 o θ = 146

Triggered hits Hits used in fit + Snapshot hits

t [ns] 11/06/2006 – C R I S

Th. Stolarczyk – CEA/Dapnia

25

What’s next? MILOM : One year of data taking Time resolution, acoustic positioning : as expected !

March 2nd : Line 1 connected First reconstructed muons 48h after connexion MILOM « seen » at 150 metres

Near future End 2006 : + 3 lines Spring 2007 : + 4 lines Autumn 2007 : + 4 lines

Next generation : a km3 instrumented volume in Mediterranean Considered within the KM3Net « design study » : 9 M€ 2006-2009 in the list of ESFRI opportunity (European Strategy Forum on Research Infrastructures) 11/06/2006 – C R I S

Th. Stolarczyk – CEA/Dapnia

26