A railway testing facility - centre d'essais ferroviaires

Rollways and 750 V dc guide bars. 750 V dc. 25 kV 50Hz - 60 Hz ... transmission systems : radiating cable or wave guide. Linked to the operation control centre, ...
2MB taille 105 téléchargements 304 vues
A railway testing facility to deliver the performance

Railway Testing Centre • a single asset working for interoperability

To bring engineering expertise to the qualification of the product To guarantee the relevance of the configuration of the test platform To develop comprehensive certification processes for the complete railway system : rolling stock, track, energy, control-command and signalling

The Railway Testing Centre is your partner to deliver the performance of your product, from the prototype to revenue service and beyond. CEF is : A high-tech platform subject to continuous improvement An expert in test engineering An operational environment for the training of your teams A showcase to present your product : events organisation

THEY HAVE PUT THEIR TRUST IN US : ALSTOM BOMBARDIER CAF CSEE VOSSLOH EURAILTEST RATP RESEAU FERRE DE FRANCE SNCF

• in the heart of a region dominated by the railway industry • participant in the French world class competence centre I-TRANS

NORTH OF FRANCE

VALENCIENNES

Northern France : The centre of railway excellence Concentration of resources rare in Europe and unique in France • France’s leading region for the railway industry • 10 000 employees in railway activity • recognized R & D centre • research institutes and universities : INRETS, University of Lille and Valenciennes, University of technology of Compiègne • design and production centres of major manufacturers : ALSTOM, ARBEL, BOMBARDIER… • companies leaders in their field : FAIVELEY, OUTREAU TECHNOLOGIES, RAILTECH, SAMBRE ET MEUSE, SCULFORT, VALDUNES… • specific network and railway company : Eurotunnel • regional association of railway industries : AIF • European Railway Agency • French railway safety agency • railway certification agency : CERTIFER With the support of

Our partners

Member of

Railway Testing Centre located in the Nord Pas-de-Calais Centre d'Essais Ferroviaire - Rue Fresnel – BP 9 59494 PETITE FORET Tél. : +33 (0)3 27 32 30 25 – Fax : +33 (0)3 27 32 46 50 - [email protected] - www.centre-essais-ferroviaire.com

Railway Testing Centre working for interoperability

Curves R = 190 m R = 185 m

{

R = 150 m with Track cant = 0

The Test Tracks’ characteristics

R = 325 m R = 310 m R = 305 m

Performance test track

Endurance test track

Driverless test track

VEV

VAE

PASC1

2 720 m

1 828 m

1 798 m

1 628 m

110 km/h

90 km/h

80 km/h

1 400 m

201 m

181 m

80 km/h 1628 m 60 m 80 km/h 60 m 10 ‰

Dimensions Length Storage track

Maximum speed Straight section

Including 380 m of Continuously Welded Rail

Maximum gradient

7,6 ‰ *

8.8 ‰

9‰

Curve radius

325 m

310 m 190 m

305 m 185 m

25 kV 50Hz - 60 Hz

3 test tracks totalling 8 km

15 kV 16 2/3 Hz 3 000 V dc

Characteristics common to the 3 tracks Loading gauge Axle load Rail gauge Rail size Maximum cant Gradient

1 500 V dc

UIC GC 22,5 T 1435 mm* 50 E6 (U50) 160 mm 1/20

750 V dc rd 3 Rail

• Workshop

power supply : bottom contact**

Rollways and 750 V dc guide bars

Track on pit

Workshop Office

equipped with a 1500 V dc traction drive, it is capable to test individual equipment and components through the full test range

Testing a large range of rolling stock • Special vehicle • Locomotive • Freight wagon • Metro • Coaches • Tram-train • Trams • Electric Multiple Unit and Diesel Multiple Unit

Power supply

CEF 63 KV 50HZ

The substation accepts regenerative braking energy in both ac or dc configuration.

TRANSFORMER 20 MVA

- 90 metre pit track - overhead catenary with full dc voltage range - 750 V shop socket

• Ballast loads • Lifting cradle • Overhead crane • Mobile lifting jacks • Diesel Filling station • Test vehicle :

63 KV/21.5 KV

EDF

PR

The Test Centre allows testing of the whole of a railway system whether urban or conventional railways

2x5 MVA

PTM

4.7 MVA

Voltages can be varied over the full EN 50163 range.

• Electric traction and braking performance • Starting performance of traction control systems • Speed regulation system tests • Adherence performance • Residual acceleration of the train at maximum speed (limited to 100 km/h) • Brake management during emergency brake application • Speed indicator : measurement of the display accuracy

OD

RD

Track units

750VCC

1500VCC

3000VCC

25KVAC 50/60Hz

15KVAC 16 Hz 2/3

PASC VAE VEV

PASC VAE VEV

VAE VEV

VAE VEV

VAE VEV

RD M ID

RAIL DDP 50V

HACH

OD

OVERHEAD CATENARY

OD

HACH M

• Radiated electromagnetic disturbances • Interference with telecommunication lines

Dynamic performance • Ride quality • Running behaviour - Applied forces on the track

Braking • Braking performance • Tests under degraded adhesion conditions • Wheel Slide protection System: adjustment and tests under very degraded adhesion conditions

RD

• Urban: Driverless (PASC) track equipped with two transmission systems : radiating cable or wave guide. Linked to the operation control centre, the system allows testing of metros in full driverless mode. • Conventional: Endurance test (VAE) track equipped with ERTMS beacons and two RBC (Radio Block Centre). Combined with GSMR radio communication, the system allows early validation of both trackside and on-board equipment in all possible configurations.

Traction performance

Electromagnetic compatibility

*Average gradient on the straight section : 1,5 ‰ **Client specific 3rd rail can be installed on a straight section of 400 m power operated switch

• Measurement of internal noise, both static and dynamic • Measurement of external noise at 7,50 m from the track: with train at constant speed, in acceleration and in deceleration

• Compatibility with track circuits • Compatibility with electronic wheel detectors

Infrastructure for rubber-tyred metro

Track with filling station

Noise

Compatibility between rolling stock and train detection systems

750 V dc

*With gauge widening in curves

switch with swingnose crossing

150‰m* 10 150 m

Overhead power supply - 5 MVA per track

Facilities and support equipment

PASC2

Dynamic tests performed on rolling stock

• Parking brake : measurement of forces applied on wheels and discs + operation of braking test system • Anti-slip system : performance and operation • Brake blending : operation

Train operation • Train command, control and monitoring systems • Sanding and wheel flange lubrications systems • Magnetic friction braking / eddy-current braking • Braking in the event of loss of train integrity

Operation of safety equipment • Track/train communication, event recorder, driver vigilance devices • ERTMS level 1 and 2: ETCS and GSMR • Operation of signalling systems • Operation of automatic train protection system

Thermal capacity tests • In traction • In braking • Air flow control

Infrastructure tests possible Maintainability, stress and performance tests of • components: - welding, - fasteners, - sleepers, ties - catenary bracket arm assembly, etc. • equipments: - system of track-mounted rail lubricators, - signalling, etc.

Tests of measurement and maintenance equipment

A high-tech platform focussed on validation of new product developments and their integration