05

Jul 20, 2005 - Procedures\StEM Access Procedures07-20-05.doc. StEM Mini-movie ... Contact one of the participating Post Production facilities from the approved vendor list provided on the last page of this document. 2. They will provide ...
104KB taille 5 téléchargements 387 vues
StEM Mini-movie Access Procedures 07/20/05 Following is the procedure for gaining access to the ASC/DCI StEM material. Be advised that there are different versions of this material. (e.g. 4K, 2K, RGB and XYZ files). A comprehensive list is provided at the end of this document and will be updated on an asneeded basis. 1. Contact one of the participating Post Production facilities from the approved vendor list provided on the last page of this document. 2. They will provide you with an executed copy of the DCI StEM User Agreement. 3. Review the document and if agreed, sign and return the original copy to that facility. (A faxed copy will suffice to begin the transaction, however, the original agreement must be returned within 5 business days of the execution.) 4. Requests for utilization of the material that is outside the realm of the User Agreement shall be discussed with DCI on an individual basis. 5. The requesting party is entirely responsible for compensating the Post Production facility. 6. When the recipient of the StEM is finished with the material, they shall delete the material from their systems. The material was designed for the following purposes: 1. 2. 3. 4. 5.

Digital Cinema Testing and SMPTE image/video testing Industry Standards Evaluations and Demonstrations (E.g. SMPTE, ISO, etc.) Industry Trade Show Demonstrations Industry standards, evaluations and demonstrations Educational purposes

Page 1 of 4

R:\Tech Group\ASC-DCI Shoot\StEM Agreements & Access Process\StEM Access Procedures\StEM Access Procedures07-20-05.doc

Available Material 1. StEM Uncompressed Mini-Movie with Trailer a. 4096x2160 (1714), 16 bit Tiff Files, X’, Y’, Z’ Color Corrected [Running Time ~12 minutes, 17239 frames, 41MB/frame, ~682 GB] b. 4096x2160 (1714), 16 bit Tiff Files, R’, G’, B’ Color Corrected [Running Time ~12 minutes, 17239 frames, 41MB/frame, ~682 GB] c. 2048x1080 (857) 16 bit Tiff Files, X’, Y’, Z’ Color Corrected [Running Time ~12 minutes, 17408 frames, 11 MB/frame, ~170 GB] d. 2048x1080 (857) 16 bit Tiff Files, R’, G’, B’ Color Corrected [Running Time ~12 minutes, 17408 frames, 11 MB/frame, ~170 GB] e. HD, SMPTE 274M 1920x1080 (803) Y,Pb,Pr, HD-D5 [Running Time ~12 minutes] f. 5.1 Audio Stems i. 6 channels or 48kHz , 24 bit, wav files ii. Left iii. Right iv. Center v. Sub vi. Left Surround vii. Right Surround viii. Conformed to Image including 2 pop ix. Broken into 7 reels with crossover on tails (Available Soon) g. Complete Final Mix 5.1 conform i. 5.1 Audio Mix 2. StEM Compressed and Packaged Mini-Movie with Trailer a. (Available Soon)

Page 2 of 4

R:\Tech Group\ASC-DCI Shoot\StEM Agreements & Access Process\StEM Access Procedures\StEM Access Procedures07-20-05.doc

Post House Contacts for StEM

Domestic FOTOKEM Larry Michalski 2801 W. Alameda Avenue Burbank, CA 91505 (818) 846-3101 X-595 Email: [email protected] IVC Scott Call 2777 Ontario Street Burbank, CA 91504 (818) 569-4949 Email: [email protected] PACIFIC TITLE Michael Moncreiff or Marc Ross 7215 Santa Monica Blvd. West Hollywood, CA 90046 (323) 436-3850 Email: [email protected] or [email protected] SOCIETY OF MOTION PICTURE AND TELEVISION ENGINEERS Carl Girod Director of Engineering 595 West Hartsdale Avenue White Plains, NY 10607 USA (914) 761-11 00 x103 Email: [email protected]

Page 3 of 4

R:\Tech Group\ASC-DCI Shoot\StEM Agreements & Access Process\StEM Access Procedures\StEM Access Procedures07-20-05.doc

International IMAGICA Kohei Endo Digital Cinema Lab. Motion Picture Div. IMAGICA Corp. 2-14-1 Higashigotanda, Shinagawa TOKYO 1410022, JAPAN Phone: +81,-3-3280-1409 Fax: +81,-3-3280-1509 E-mail: [email protected] THE FRANUHOFFER INSTITUTE Siegfried Foessel Am Wolfsmantel 33 D-91058 Erlangen 49-499-131-776-543 [email protected] THE WORX DIGITAL LTD Jon Thompson 105 White Cross Street Londdon EC 1Y8JD 44-207-588-7844 [email protected]

Page 4 of 4

R:\Tech Group\ASC-DCI Shoot\StEM Agreements & Access Process\StEM Access Procedures\StEM Access Procedures07-20-05.doc