Soft Links - Parachutes Australia

FOR REMOVABLE SOFT LINKS. 1.Pass the softlink through the riser and the lines ensuring that you tuck the corners of the riser webbing in. 3. Both ends of the.
139KB taille 3 téléchargements 472 vues
PARACHUTES AUSTRALIA

22 Bosci Road, Ingleburn N.S.W. AUSTRALIA 2565 Ph: + 61 2 98295355 Fax: + 61 2 98291300 email: [email protected]

INSTALLATION INSTRUCTIONS FOR REMOVABLE SOFT LINKS

1.Pass the softlink through the riser and the lines ensuring that you tuck the corners of the riser webbing in.

4. Pass the end through the opening under the tab

2.Pass the Softlink through the riser and line group a 2nd time.

3. Both ends of the Softlink should exit on the same side

5. Feed the tab through the loop.

6. Pull the tab so that the loop tightens. 7. Check that the riser corners are tucked inward evenly. Rotate the whole link until the tab is located within the riser webbing opening..

8. Grasp above and below the softlink and pull to 20kg to set the link into an oval shape. This will ensure that the tab remains located inside the riser webbing opening.