Schematic Diagramm: Installation point of the gas sampling ... - MPIP

Schematic Diagramm: Installation point of the gas sampling probe at the kiln inlet. (Example). View of the inlet chamber from above. Sampling probe location.
250KB taille 6 téléchargements 261 vues
Rotary kiln (Top view)

Schematic Diagramm: Installation point of the gas sampling probe at the kiln inlet (Example)

Kiln Inlet Chamber (Cross section) Kiln direction of rotation

View of the inlet chamber from above

Sampling probe location in the kiln

Installation area of sampling probe in the kiln

Gas flow direction

Kiln view seen from the preheater tower

Gas sampling opening

~ 0.5 m

90° min. 0.3 m

Side view

Sampling probe (30 E 1)

3°-10°

Inlet chamber of preheater tower

~5m

Space requirement

11.11.1997 Th. Walther

Gas Sampling System Type FLK Installation Example FLK-MON1.DRW