PS Project System SAP ERP Central Component Release 5.0
Release Notes
© Copyright 2004 SAP AG. All rights reserved. No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information contained herein may be changed without prior notice. Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors. Microsoft®, WINDOWS®, NT®, EXCEL®, Word®, PowerPoint® and SQL Server® are registered trademarks of Microsoft Corporation. IBM®, DB2®, OS/2®, DB2/6000®, Parallel Sysplex®, MVS/ESA®, RS/6000®, AIX®, S/390®, AS/400®, OS/390®, and OS/400® are registered trademarks of IBM Corporation. ORACLE® is a registered trademark of ORACLE Corporation. INFORMIX®-OnLine for SAP and Informix® Dynamic Server Incorporated.
TM
are registered trademarks of Informix Software
UNIX®, X/Open®, OSF/1®, and Motif® are registered trademarks of the Open Group. Citrix®, the Citrix logo, ICA®, Program Neighborhood®, MetaFrame®, WinFrame®, VideoFrame®, MultiWin® and other Citrix product names referenced herein are trademarks of Citrix Systems, Inc. HTML, DHTML, XML, XHTML are trademarks or registered trademarks of W3C®, World Wide Web Consortium, Massachusetts Institute of Technology. JAVA® is a registered trademark of Sun Microsystems, Inc. JAVASCRIPT® is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and implemented by Netscape. SAP, SAP Logo, R/2, RIVA, R/3, SAP ArchiveLink, SAP Business Workflow, WebFlow, SAP EarlyWatch, BAPI, SAPPHIRE, Management Cockpit, mySAP.com Logo and mySAP.com are trademarks or registered trademarks of SAP AG in Germany and in several other countries all over the world. All other products mentioned are trademarks or registered trademarks of their respective companies. Design: SAP Communications Media
Release Notes Table of Contents SAP AG ______________________________________________________________
19 19.1 19.2 19.2.1 19.2.1.1 19.2.1.1.1 19.3 19.3.1 19.3.1.1
PS Project System Structure of the Project System IMG (Changed) PS-ST Structures PS-ST-OPR Operative Structures PS-ST-OPR-NET Network and Activity Catalog Interface for Services (New) PS-DAT Dates PS-DAT-NET Network Scheduling Overall Network Scheduling with Selection Option (New)
1 1 1 1 1 1 2 2 2
______________________________________________________________ SAP AG
iii
Release Notes ______________________________________________________________
19 PS
Project System
19.1 Structure of the Project System IMG (Changed) Use As of SAP ECC 5.00, the structure of the Implementation Guide (IMG) for the Project System has changed. To transfer the changes to the project IMGs, you must regenerate the project IMGs. New IMG Activities Area Project System --> Dates --> Scheduling --> -
Define Levels for Networks
-
BAdI: Overall Network Scheduling with Selection Option
19.2 PS-ST 19.2.1 PS-ST-OPR 19.2.1.1 PS-ST-OPR-NET
Structures Operative Structures Network and Activity
19.2.1.1.1 Catalog Interface for Services (New) Use As of SAP ECC 5.00, PLM Extension (EA_PLM 500), you can call up an external catalog in a maintenance order or service order, a maintenance task list or a network, and copy services from this catalog into the order or task list or network. You also now have the option of storing multiple catalogs for each of the following criteria: -
Order type and planning plant
-
Task list category and plant
-
Network type and plant
Effects on Customizing In Customizing under Convert HTML Fields to SAP Fields, you must convert the field NEW_ITEM-SERVICE to the field RIHFCOM_XL-SERVICE. See also For more information, see the SAP library for the component Plant Maintenance (PM) under
______________________________________________________________ SAP AG
1
Release Notes ______________________________________________________________
Catalog Interface (OCI - Open Catalog Interface).
19.3 PS-DAT 19.3.1 PS-DAT-NET
Dates Network Scheduling
19.3.1.1 Overall Network Scheduling with Selection Option (New) Use As of SAP ECC 5.00, you can restrict the number of networks that you want to schedule when scheduling hierarchical project structures with subnetworks. You can branch directly from the subnetwork monitor to the screens for processing or confirming the selected networks. By using this restriction, you can reduce considerably the time it takes to schedule large subnetwork structures. Effects on Customizing To use the function, you must Define Levels for Networks in Customizing for the Project System. In addition, the Business Add-In (BAdI) Overall Network Scheduling with Selection Option is available.
______________________________________________________________ SAP AG
2