source, two flanges and an aiming tool. The light source is a ... process flange (which will be the case when the first flange is aligned). Halogen light source.
Instruction for Flange Alignement Kit The flange alignement kit is intended for use when installing the two opposite process flanges on the measurement volume. It consists of a light source, two flanges and an aiming tool. The light source is a halogen lamp with a wide beam angle and can consequently be mounted on non aligned process flange (which will be the case when the first flange is aligned).
Procedure
2. 3. 4.
5.
6. 7.
Weld the process flanges loosely to the measurement volume - they should be possible to align with a rubber hammer. Mount the alignement kit as illustrated to the right Alignement Turn on the light kit flange Halogen source light source Adjust the focus on the aiming tool so the image of the light source is sharp. Align the process flange (marked red here) using for instance a rubber hammer. The flange is aligned when the light source image is centered on the aiming tool. Do the final welding on this flange Go through the same procedure (point 2 through 6 above) for the opposite flange
Reading of error angle using the Flange alignement tool The graph to the right shows the angle error as a function of the light spot distance from the center at the limits of the focal distance setting of the tool. It shows that the ±2 deg demand is met if the spot is inside the fifth ring on the aiming tool – in other words if the spot is inside a circle with a 5 mm radius.
Le terme AVERTISSEMENT souligne un danger potentiel qui peut entraîner des ..... ouverte, usure de siège, barrière de sécurité desserrée ou laissée ouverte, ...
Look through the finderscope (the eyepiece end of the finderscope) and take ... moving the main telescope, turn the adjustment thumbscrews located around the.
HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH. • Apply appropriate personal protective equipment (PPE) and follow safe electrical work practices. .... observez les méthodes de travail électrique sécuritaire. Voir NFPA 70E. • Seul un personnel qua
Allow a 15-minute warm-up period. CAUTION: Use isolation transformer or observe polarity when connecting te. | Maintain line voltage at 120V AC. Adjustments ...
HAZARDOUS VOLTAGE. ⢠This equipment must be installed and serviced only by qualified electrical personnel. ⢠Turn off all power supplying this equipment ...
This device must be separated from household waste and sent to special collection ... This is an indication for protection against ingress of water and particulate matter. ... With pain relief programmes, electrostimulation can be used to treat.
94121X. 1. Only use this device with cables, electrodes, battery, power adaptor and ...... alle caratteristiche di eccitabilità di quest'area del corpo, a seconda della.
This is an indication for protection against ingress of water and particulate matter. .... The interdependent channels are displayed in white on a black background.
With good knowledge of human physiology and full control of stimulation ... AUTO:backlighting activated every time a button is pressed. ...... identique, le programme Hypertrophie du Compex apporte un gain de volume plus grand qu'avec le ...
Oct 9, 2004 - Book your hotel / youth hostel rooms / bed and breakfast! .... Africa, Middle East, Central and Eastern Europe, South Asia, Latin America and the ...
Cogent-HPLC.com. HSQ⢠Kit for HPLC ... HPLC Performance Qualification test kit, complete ... Test Kits. For more information visit www.mtc-usa.com. WHAT IS THE HSQ⢠KIT? ... information, calculates and graphs results; print out and sign.
interruptor está sujeto con dos ... dos tornillos provistos. .... 1.0. 0.3. 0.1. â. 0.2. 0.1. â. â. 10. 10. 10. â. Tabla 2: Capacidades de los interruptores de resorte.
MicroSolvTech.com ... The HPLC Performance Qualification (PQ) Kit is designed to allow you to test and ... A dedicated, premium test column ... Software automatically compiles information, calculates and graphs results; print out and sign.
18 sept. 2012 - India suffers when Prime Minster Indira Gandhi declares The Emergency ..... …and that actually is how the movie came together: cut by cut, ...
Feb 10, 2015 - slightly out of tune with the music the trail is playing, but give it .... Nukeproof's collective mind, and ...... control of the suspension behaviour. 73°.
Data System, and following your company's internal SOP's regarding documentation. ... to your laboratory, with your company's name and other information, ...
26 janv. 2016 - shed snow, ice or excessive run off onto your shelter. DO NOT hang objects from the roof or support cables. WARNING: Risk of fire. DO NOT ...