New Feeding Method for High Efficiency Data Centre. Copyright © 2011 ... Server. ~. 58~70%. DCdc. DC/DC. Centralized power. PDU (DC). C o m ..... This company constructs the data center of 4000 racks scale in the autumn of this year.
1MB taille 5 téléchargements 224 vues
HVDC (High Voltage Direct Current) New Feeding Method for High Efficiency Data Centre

Copyright © 2011 NTT DATA INTELLILINK CORP.

Background  APEC at Yokohama JAPAN (Nov. 2010) One of the Action list supporting the APEC leaders’ strategic growth is, ・Promote energy conservation activities through the introduction of more energy efficient ICT devices and systems, including data centres and ICT utilization in many sectors and new ICT services such as cloud computing (Green ICT).  Recently, the situation at the data centre has widely changed. •Support for environmental protection • Initiatives to Green ICT •Correspondence to ICT technology with fast advancement.  To achieve the Green data centre. •Air-conditioning efficiency improvement •Server consolidation by virtualization •High Voltage Direct Current ( HVDC )

Copyright © 2011 NTT DATA INTELLILINK CORP.

It is possible to achieve it by HVDC. 1. Energy-saving design Comprehensive efficiency 20~35% improvement! Naturally, the electricity bill of operating is reduced and The CO2 emissions significantly reduced!

2. High-reliability design

3. Safety design

UPS is unnecessary. The system down is prevented by the n+1 composition.

The electric shock, an earth fault, and the arc problem are cleared.

Power Supply Rack( small-sized ! From 1/5 to 1/10 compared to UPS. !

Server Racks

Copyright © 2011 NTT DATA INTELLILINK CORP.

1.Energy-saving design - Efficiency comparison



UPS system (current)

IT equip.(Server, etc.)

UPS

AC

ICT

UPS

Alternating current

Switching board

AC

AC

DC AC

AC

DC

DC12V

CPU

Direct current

AC incoming

HVDC HVDC PS Rack

IT equip.(Server, etc.) ICT

HVDC

AC

DC

DC340V

DC

AC incoming

Two conversions are eliminated. Significant energy saving. Further improved reliability.

DC

Copyright © 2011 NTT DATA INTELLILINK CORP.

DC12V

CPU

1.Energy-saving design - Efficiency comparison



PDU (AC)

UPS system (current) 80~85%

98%



Transformer

AC

UPS

Server Rack

75~85%

98.5% S/B

AC/DC

AC

Server

58~70% HVDC

12V systems is

20~35% power reduction.

PDU (DC)

HVDC 98% Transformer

AC

98% PS Rack

Server Rack

95% DC/DC

DC340V

Approx.91%

Compensating circuit of Bus for stabilizing



※The air conditioning power reduction also added!

Centralized power.

DCdc DC12V w/o power supply

Server

※ Efficiency calculation is the reference on 50% load. ※ Value about the efficiency varies depending on the configuration.

Copyright © 2011 NTT DATA INTELLILINK CORP.

4

2. High-reliability design -

n+1 The merit of redundancy -

The Spare always backs up with n+1. System does not down even the failure of multiple locations!

HVDC Power Supply Rack

DC server

n+2

DC server

Trouble Rectifier

Rectifier

DC server

Rectifier

Rectifier

DC server

n+1

Rectifier

Rectifier

Trouble

Rectifier

20kVA 20kVA

AC incoming

Transformer

Commercial power supply A

Transformer Commercial power supply B

Spare

Server Rack 4kW

Non-stop system

Transformer

20kVA 20kVA

20kVA 20kVA 20kVA

DC

Rectifier

Distribution board

20kVA

Rectifier

Rectifier

Rectifier

Rectifier

20kVA

20kVA

DC340V

DC server DC12V Trouble

DC/DC DC/DC DC/DC 2kW 2kW 2kW

20kVA 20kVA

Central Power Supply(n+1)

Spare

Spare

It is possible to be extended without stopping the system!

n+1 n+1 (Spare)

(Spare)

Copyright © 2011 NTT DATA INTELLILINK CORP.

3. Safety design

We achieved "Safety" by our new technology , HVDC !

① ARC Restraint Technology

②Middle point ground Anti-electric shock ・ earth measure

・By setting the arc control circuit, suppress the generation of the arc.

Arc outbreak at the time of the direct current interception had been a problem.

・An electric shock, an earth fault with high voltage are limited on a secure current value by the high resistivity of 47kΩ.

Danger associated with the high voltage had been pointed out.

Copyright © 2011 NTT DATA INTELLILINK CORP.

Electric shock and earth fault protection - Middle point ground - There is no influence on the system feeding power by the leakage (electric shock) and the earth fault.

47kΩ E 340V

R1 47kΩ -170V

380V x 47kΩ 47kΩ×(47kΩ+2kΩ)+47kΩ×2kΩ

= 7.5 mA

I3

E×R2 R1

・・・

When the leakage( electric shock ) detected, turn off the switch and interrupting the route of leakage, and the electric shock is instantaneously stopped. ◆ When getting an electric shock, the current that flows to " a human is 2( kΩ ) of resistance ".

I3 = Calculating formula

E

I3

0V

at equivalent circuit. R3

Middle point ground

Server

R2

Leakage (electrical shock)

R2

Human R3:2kΩ

Server

rectification

+170V

I3 =

R1×(R2+R3 )+R2 ×R3

※In an actual device, short time peak current flows by the load. However, we solved in discharge circuit.

◆ We developed high-resistance grounding method aimed at high-voltage electric shock accident prevention. Copyright © 2011 NTT DATA INTELLILINK CORP.

HVDC

- Basic system configuration -

ΔY transformers

SERVER RACK

PS RACK

AC

DC340V

DC/DC

340V→12V

Server Server Server

During a power outage. DC/DC 340V→48V

Server Server Server

Battery Three-phase Δ結線 Delta Connection

3相交流

six-phase full wave rectification DC340V

. Phase shift 30°

Three-phase Y結線 Star Connection 3相交流

Battery voltage DC288V

Copyright © 2011 NTT DATA INTELLILINK CORP.

Floor Configuration

Conventional AC ・UPS systems



HVDC systems Floor layout 1

A/C 空調

A/C 空調

A/C 空調

空調 A/C

高圧 High-voltage transformers トランス

A/C 空調

各種SW S.B UPS UPS UPS Battery バッテリー A/C 空調

A/C

A/C 空調

A/C A/C 空調

A/C

A/C 空調

Electrical room 電力室

特 高 受 電

非常用

Generator エンジン

特 高 受 電

PS PS

高圧

Rack ラック

High-voltage transformers トランス

Battery バッテリー 空調 A/C

A/C 空調

Copyright © 2011 NTT DATA INTELLILINK CORP.

非常用 エンジン

Generator

高圧 High-voltage transformers トランス

A/C

A/C A/C 空調

バ ッ テ リ ー

A/C

A/C 空調

バ ッ テ リ ー

サ ー バ ラ ッ ク

バ ッ テ リ ー

Battery

サ ー バ ラ ッ ク

Battery

バ ッ テ リ ー

Server rack

バ ッ テ リ ー

PS Battery

サ ー バ ラ ッ ク

Server rack

バ ッ テ リ ー

Battery

バ ッ テ リ ー

※構成例

PS Battery

サ ー バ ラ ッ ク

バ ッ テ リ ー

A/C 空調

PS Battery

バ ッ テ リ ー

Battery

サ ー バ ラ ッ ク

Battery

Battery

バ ッ テ リ ー

PS

Server rack

PS

A/C A/C 空調

A/C 空調

空調 A/C

空調 A/C

非常用

Generator エンジン

A/C 空調

Electrical room 電力室 Special-high power receiving

A/C 空調

Electrical 電力室 room Special-high power receiving

サ ー バ ラ ッ ク

サ ー バ ラ ッ ク

PDU A/C 空調

特 高 受 電

サ ー バ ラ ッ ク

Special-high power receiving

PDU

サ ー バ ラ ッ ク

A/C A/C 空調

Server rack

PDU

A/C 空調

A/C 空調

Server rack

PDU

サ ー バ ラ ッ ク

A/C 空調

Server rack

PDU

サ ー バ ラ ッ ク

Server rack

サ ー バ ラ ッ ク

Server room サーバー室

Server rack

A/C 空調

A/C 空調

Server rack

PDU

サ ー バ ラ ッ ク

A/C 空調

Server rack

PDU

サ ー バ ラ ッ ク

Server rack

PDU

A/C 空調

Server rack

A/C 空調

Server room サーバー室

Server rack

Server room サーバー室

Floor layout 2

Battery



Server rack

HVDC

Result of JAPAN

Major data center company A  This company constructs the data center of 4000 racks scale in the autumn of this year.

Major data center company B 

This company is examining the introduction at the beginning of next year .

Major carrier 

C

The evaluation machine was introduced.

Copyright © 2011 NTT DATA INTELLILINK CORP.

Suggestions The photovoltaic generation Installation.

General method of Japan

HVDC

photovoltaic panel

AC

340V

UPS

AC/DC

AC/DC

12V

ACRectification

340V

Efficiency 97%

AC/DC

12V

Unnecessary

DC/AC Unnecessary

Battery

Battery

HVDC can be used without converting the power of the photovoltaic generation. DC200~400V

HVDC Supply AC incoming

Server, Router, etc.

DC/DC

Converter

Server, Router, etc.

Power controller

Converter

DC/AC

photovoltaic panel

MTTP with control operation DC/DC Converter

DC400V DC340V

Non-priority

Priority

Unnecessary

(AC) (DC)

The output of the photovoltaic panel is a high voltage, So the HVDC data centre is a good combination ! ・No power controller Highly effective, high reliability, and low price ! ・As running out of the photovoltaic generation power, the electric power is automatically supplied from the AC system side. ・HVDC does not flow back to the AC system in waveform troubled!

If you have any interest in our products, please feel free to contact the following address. Thank you for your attention.

[email protected] Green Consulting Business Unit Green Consulting Business Division NTT DATA INTELLILINK CORPORATION

Copyright © 2011 NTT DATA INTELLILINK CORP.