collapsible pilot chute installation, operation & bridle routing
Feb 12, 2015 - grommet in the top of your main bag. The bridle should ... before you begin packing, and check ... While closing the container, ensure that the ...
COLLAPSIBLE PILOT CHUTE INSTALLATION, OPERATION & BRIDLE ROUTING INSTALLATION Locate your main bag and your new collapsible pilot chute and bridle.
Run the looped end of your bridle opposite the pilot chute, through the grommet in the top of your main bag. The bridle should be inserted from the outside to the inside (Figure 1).
Stop Tabs
Figure 1
Stop block Note: Bag stop tabs must pass through the grommet to inside of bag. If it is not, your pilot chute will collapse when deployed and not function properly.
Pull your bridle and ‘Stop Tabs through the main bag grommet, until the grommet is snug against the stop block on the outside of the bag (Figure 2). Squeezing the ‘Stop Tab’ together will ease pulling it through.
Stop Block
Move the two fabric loops (Stop Tabs) on the bridle back so they rest against the grommet on the inside of the bag (Figure 3).
Figure 2
Locate the bridle attachment point on the main canopy.
Outside of bag
Inside of bag Stop Tabs
Pass the looped end of the bridle through the bridle attachment point . Pass the pilot chute and bag through the looped end of the bridle, and tighten up the larks head created.
Figure 3
INSTRUCT-015 Collapsible Pilot Chute Installation & Operation Instructions Rev 3.doc
INSTRUCT-034 REV 3
Page 2 of 2
OPERATION To cock your pilot chute, step on your main bag and pull the handle on the top of the pilot chute with one hand, while holding the bridle straight with the other. Pull the handle all the way out until it will move no further. (Figure 4).
2/12/2015
Figure 5
You must see the green marking on the kill line to be sure it is fully cocked (Figure 5). Always remember this procedure before you begin packing, and check it after you place the bag in the container. This assures that the bridle has not become partially un-cocked while packing.
Figure 4
Kill Line Verification Window
BRIDLE ROUTING While closing the container, ensure that the bridle is routed out from the bottom of the right side flap #3 (Figure 6) After closing the container, insert the pin through the main closing loop from the bottom of the container, (Figure 7)
Figure 6
The green indicator on the bridle should be facing up (Figure 8), and the excess bridle can be tucked away under right side flap #3
Figure 7
* Bridle color enhanced for instruction purpose.
Figure 8
INSTRUCT-015 Collapsible Pilot Chute Installation & Operation Instructions Rev 3.doc
Verify that the pilot chute is cocked: A blue kill-line (1-7) will be showing in the bridle window (near the closing pin) when the pilot chute is cocked. 1-1. 1-2. 1-3.
as designed in slow speeds if the pilot chute is not installed correctly and âcockedâ prior to closing the container. Your Pilot Chute will display a color in the bridle.
b) When installing collectors on the ground, do not build a rack support that could allow children access .... SmartPool recommends that you store your collectors.
Jun 3, 2017 - Switch Function: In the shutdown state, long press the start button and hold for 3 seconds to turn on the power supply, the machine automatica.
Mounting the amplifier upside down to the rear deck of the trunk will not provide proper cooling and will severely affect the performance of the amplifier and is ...
Thermostat À Bulbe Électromécanique Et. Capillaire Thermostat : Modèles Fabriqués Avant Septembre 2003. 1. Retirer soigneusement le cadran, sans modifier ...
Émail Noir. – Laisser l'équipement refroidir après utilisation et laver tous les dépôts graisseux à l'extérieur avec une solution très chaude de détergent doux ou ...
The APX201.2 and APX401.2 use an unregulated MOSFET power supply for superior ... Protection circuits safeguard the amplifier when overheating, speaker ... WARNING:When using the speaker (high-level) inputs, the Black wire must.
One SmartPool Mounting Kit SK-43 for each solar box. One High wind kit SK-34 for each collector in high wind areas. ⢠You will need the correct amount of 1 1/2" ...
Appliquez de la colle et un produit d'etancheite sur tous les joints ... permet d'obtenir Ie volume du caisson sans devoir faire de calculs compliques de ..... Contact the Authorized Rockford Fosgate Dealer you purchased this product from.
May 19, 2010 - Advisories associated with propellers in this manual are freely disposable at ... and it´s not to be regarded as binding on any propeller type or her section. ..... The front spinner support is used to have the balance weights install
OPERATION MANUAL ..... Optimal cool down will be achieved with the door open slightly. Opening .... When baking, weigh or measure the product in each pan.
Floor under product MUST be at or above the same level of the surrounding ... Do not place the freezer next to heat-producing appliances such as a range, oven or ...... Customer education or instructions on how to use the refrigerator/freezer.
Dealer's name and address ...... walls, or in the form of droplets of ice or âiciclesâ... especial- ly in hot or .... 800.223.3900 for directions on how to obtain warranty.
cuillers à café de bicarbonate de potassium dans un litre d'eau tiède. Des produits abrasifs puissants et des poudres nettoyantes ne sont pas nécessaires et ne ...
Operation and. Maintenance. Instructions. Built In. Wine Cellars. M18SZ ..... The enclosure must permit the wine cellar to be removed ..... Metal side panel. 24".
Warnings and safety instructions appearing in this guide are not meant to cover ...... glass, mirrors, granite or similar heavy materials for panels. Mounting grille ...
Should you wish to test pump operation, turn ... You should now .... dans le tube de décharge entre la pompe et le clapet antiretour afin de faciliter l'amorçage.
2 sept. 2016 - age access. The sealed .... Install the rear access cover with the vent tube coming out the upper .... age (à partir de l'étiquette à son extrémité) ...
The following guide lines may be helpful; ... the line current rating of the transformers primary and secondary ... d) When windings are connected in parallel (as in.
with the stacking bracket, using (6) 1/4-20 machine screws, lock washers ... F. Plug the cord set of each unit into a 115-Volt power supply outlet. ...... Réglez la première température de cuisson à l'aide du cadran. t Ap puye z su r la to uche prod