+BATT power (after IG switch) wiring(orange) is connected with the wiring where the +batt power is supplied when the IG key switch is turned on. In the case of ...
boost sensor w iring *1 throttle sensor w iring Injector w iring
tem perature sensor w iring
signal interface w iring
"dial controller" w iring
E C U *2 connector
pum p w iring
ground (0V ) w iring (w ith round term inal)
*1 D -JE tronic V ersion O nly *2 E C U : E lectoronic C ontrol U nit
(1)
P lease decide the position w here each unit is installed.
(2)
P lease install each unit, and fix.
(3)
P lease fix the harness to the vehicle by using the band etc.
backup pow er(+ BATT) w iring
+ B A T T pow er (after IG sw itch) w iring
T he harness kit is designed so that E C U is installed at the center of the vehicle.
P1
[ G uidance of harness connection ] * A tte n tio n : P le a s e re m o v e th e te rm in a l fro m th e b a tte ry b e fo re b e g in n in g in s ta llin g . * A tte n tio n : P le a s e c o n n e c t a n o ra n g e , re d w irin g to th e lin e a fte r th e fu s e .
(4)
+B A TT pow er (after IG sw itch) w iring(orange) is connected w ith the w iring w here the +batt pow er is supplied w hen the IG key sw itch is turned on. In the case of H onda M onkey,"IG " line is usually in the m eter case(front light case).
In the M eter (front light) case.
T w o connectors ( for + B A T T IG and + B A T T -backup) are in this kit. (use If you w ant.)
+ B A T T pow er (after IG sw itch) cable (orange)
[ G uidance of harness connection ] (5)
P lease connect red w iring (red) w ith the line connected w ith the plus term inal of the battery. (A fter off the key, this pow er supply is used for E C U only betw een a few seconds. A fterw ards, this pow er supply is not used. EC U doesn`t need an extra standby pow er requirem ent. )
(6)
P lease install the earth connection line (w ith round term inal) in the earth of the body (battery m inus).
(7)
P lease confirm not be w rong the connection of the plus and the m inus of w iring.
C onnecting red w iring to the plus line of battery.
red w iring : + batt (back up pow er) earth connection w iring (w ith round term inal)
P3
[ G uidance of harness connection ] (8)
P lease connect each unit to the w iring connector.
throttle sensor (3pins connector)
dial controller (6pins connector)
injector (2pins gray connector)
E C U connector (8pins and 10pins connector)
dial controller
P4
[ G uidance of harness connection ] (8)
P lease connect each unit to the w iring connector.
signal interface unit ( 4pins connector w ith light-purple w iring)
P lease connect fem ale connector of light-purple w iring to the (+) term inal of ignition coil,and conect the vehicle w iring, connected w ith the coil (+) term inal originally, to the m ale connector of light-purple w iring. In the case of H O N D A M O N K E Y(current m odel),coil(+) term inal color is green. *P lease contact m e w hen you w ant to use it w ith a beam type tim ing sensor.
(eco-run vehicle etc.)
fuel pum p w iring P lease connect pink and w hite w iring to connector of fuel pum p. pink w iring is (+), w hite w iring is (-). *If you don't need that the fuel pum p is not controlled by E C U , it is necessary to obtain the dum m y resistance. ( eco-run etc.)
P5
[ G uidance of harness connection ] (9)
First of all, please confirm the connection of w iring (E specially, (+) and (-) connection of the pow er supply). P lease turn on the pow er (IG ) sw itch after confirm ing. W hen EC U starts norm ally, the pum p is driven about ten tim es by the pulse, and dial controller's LE D turns on. P lease do initializing referring to (3) "configure and adjustm ent " chapter of the user's m anual. *W hen you bought the throttle body from us at the sam e tim e, the adjustm ent of the throttle sensor and the setting of the capacity of the injector have already been done. If you have already inform ed "FC design" of the displacem ent of the engine, a rough adjustm ent of the injection m ap is done. *P le a s e re fe r to " S ta rt-u p m a n u a l" fo r th e a d ju s te d c o n te n t.
D-jetronic ( speed density version ) Please connect boost ( manifold pressure ) sensor.
pieces, and since the coil battery that I first tried to use, if the was missing, I ... I could remove the distrib- utor, ignition .... not the wire. Repeat the process for the.
unnecessary liability. EnCase® Field Intelligence Model gives investigators a highly mobile solution to capture data from any machine with a network connection ...
When trying to respond optimally (that i\ to say ... point hypothesis (EPH) put forward by Feldman. (1966 .... when the perturbation lengthened the required move-.
but without necessarily being a specialist in the specific topic of the proposal (a generalist in the field). .... In the case of remote evaluation the evaluator's login and password .... evaluation form and can download the proposals assigned. .....
It is intended to outline a practical approach for businesses around how to think about their compliance with Article 5.3 of the Directive across EU markets.
10 sept. 2018 - distribution de fruits et légumes (ACDFL) ont joué un rôle de ..... fonctions dans le système au cours des quelques prochains mois; c'est ...
4 janv. 2019 - consommateur dans un commerce de détail ou un service alimentaire, mais ..... respecte le Règlement et que l'ACIA exerce une surveillance de son activité. ..... d'une entrée auprès de la U.S. Customs and Border Protection.
Martin (voice, piano, gui- tar), Jona- than Buck- ... He plays the guitar and the piano. He is a song ... Against Music". 11. it is a music genre which appeared in the 1960s and Michael. Jackson is one of the most famous singer of this form of music.
The electrical connections and wiring for a pump installation should only be made by ... DO NOT use this product in applications where human contact with the ...
European brands Condor, Comet and Nova, and became autonomous in 1999 with its own testing and ...... was designed with comfort and practicality in mind.
canopy, it is strongly recommended not to exceed the following limits: .... c) after the elapse of 5 years carry out overall technical inspections (validity - 2 years ... loops on the container and the closing flap of the container becomes released.
1) The physics of the combined seat belt- ... In the course of the many hours that I spent (typical ... in a high speed crash resulting from engine failure over.
Dec 14, 2012 - âA family afternoon of good old fashioned carol singing â mince pies and mulled wine. N.B. Limited numbers. Participation aux fraisâ from ...